|
COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1995 PSA#1386Officer In Charge Of Construction, 520 Turner Street, Pensacola, FL
32508-5225 Y -- RENOVATE GYM, BUILDING 1417, NAVAL AIR STATION, WHITING FIELD,
MILTON, FL SOL N52467-95-C-3128. DUE 081095. Contact Daphne Dillard,
(904) 452-4616. Please print in its entirety. This solictation has been
unrestricted and is open to full and open competition. The work
includes a new HVAC system for the gym with exposed spiral duct and a
new gas furnace that will provide hot water for heating the MWR/Library
spaces. Expose the trusses, insulate between rafters and sheetrock the
underside of the roof. Provide new bright lighting. Cover the walls
with metal wall paneling. Provide new state of the art portable
spectator seating on the south side of the gym. Redo the entrances to
the mens and womens locker rooms. Provide an electric water cooler in
the gym. Widen the gym entrance to the Nautilus Center with an open and
wider stairway. Repair gym flooring and re-mark and re-finish.
Eliminate windows overlooking the gym from the Nautilus Center. There
is a $80.00 (Non-refundable) fee per set of plans and specifications.
Make your company check or money order payable to the Navy Industrial
Fund. (Cash and personal checks will not be accepted.) Plans and
specifications will be available 30 days prior to the approximate bid
opening date and until supplies are exhausted. Hours for picking up
plans and specifications at the office location (Building 654) are 9:00
a.m. to 11:00 a.m. and 1:00 p.m. to 3:00 p.m. Planholders
(solicitation) lists will be supplied upon written request only.
Estimated Cost: $250,000 - $500,000. (188) Loren Data Corp. http://www.ld.com (SYN# 0210 19950711\Y-0035.SOL)
Y - Construction of Structures and Facilities Index Page
|
|