|
COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1995 PSA#1386Acquisition & Material Management Service, VA Medical Center, One Med
Center Drive, Clarksburg, WV 26301 Z -- REPLACE BOILERS, PHASE I SOL IFB 540-28-95 DUE 081595 POC
Contracting Officer, O.L. Higginbotham, (304)623-7653, Additional
Contact, Linda Brown, (304)623-7654 REPLACE BOILERS, PHASE I. The
project involves the replacement of one watertube boiler. Factory
assembled boiler to produce 12,000 pounds per hour or 110 PSIG steam,
to be natural gas and No. 2 oil fired with propane pilot gas back up.
Install new electronic control system. Certain construction, piping,
catwalks modification will be necessary. Alternate item will include
new feedwater economizer and condensate surge tank with tie-in to
central operator's terminal. Cost range $250,000 - $500,000. Opening
date will be on or about 8/15/95. Bid deposit of $50.00 is required.
(0191) Loren Data Corp. http://www.ld.com (SYN# 0352 19950711\Z-0097.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|