COMMERCE BUSINESS DAILY ISSUE OF JULY 13,1995 PSA#1387Officer in Charge of Construction, Box 139, NAS, Jacksonville, FL
32212-0139 Z -- REPLACE EFFLUENT PUMPS AT WASTEWATER TREATMENT PLANT, NAVAL
STATION, MAYPORT, FL Contract N62467-95-B-2516. POC OICC Office. This
is a presolicitation notice only. Do not request plans now. A
solicitation notice will be published before invitations are issued.
The work includes replacing two (2) existing vertical turbine, short
coupled effluent pumps and motors with two (2) self-priming centrifugal
pumps and motors. The existing 16-inch discharge piping will be reduced
to 12-inch. The existing pump control panel will be replaced and
relocated inside the adjacent vacuum building. Additional associated
work includes sawcutting and removal of existing asphalt and concrete
pavement, excavation, construction of new concrete pavement, drainage
improvements and electrical work. Following tentative dates apply:
Issue invitations 7/95, open bids 9/95, complete contract 4/96.
Estimated cost is between $25,000.00 and $100,000.00. (191) Loren Data Corp. http://www.ld.com (SYN# 0333 19950712\Z-0131.SOL)