|
COMMERCE BUSINESS DAILY ISSUE OF JULY 19,1995 PSA#1391U. S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-CT (PLANS ROOM NO.
1000A), P. O. BOX 2288 MOBILE ALABAMA 36628-0001, OR 109 ST. JOSEPH
STREET MOBILE AL 36602 Y -- CONTROL ROOM BLDGS G-3, E-6 & NUTCHE SHED N-6, HOLSTON AAP,
TENNESSEE SOL DACA01-95-B-0143 DUE 083195 POC Contact Mr. Earl Davis,
334/690-2535; Contracting Officer, Gene L. Curtis (Site Code W31XNJ)
The work will consist of the construction of a third story control room
for building E-6 and a second story control room for Building G-3. The
existing wood floor in Nutchie Shed N-6 will be replaced with a
concrete floor. Exterior walls will also be replaced. Critical Path
Method (Network Analysis System) is not required. Bid documents are
available on or about 01 August 1995. Costs are as follows: Plans half
size $8.00. Specifications $32.00. Estimated cost of work is between
$500,000 and $1,000,000. Requests for Plans and Specifications shall
indicate in writing whether firm will bid as a Prime contractor or a
Subcontractor. Unrestricted. All responsible sources may submit a bid
which shall be(0198) Loren Data Corp. http://www.ld.com (SYN# 0208 19950718\Y-0043.SOL)
Y - Construction of Structures and Facilities Index Page
|
|