COMMERCE BUSINESS DAILY ISSUE OF JULY 20,1995 PSA#1392Operational Contracting Office, 100 Logistics Dr., 2nd Flr, Suite 200,
Westover ARB, Chicopee, MA 01022-1531 Z -- M/R/A B 1301, PHARMACY. Sol IFB F19617-95-BA010 due 091195.
Contact Edward Popielarczyk, 413/557-2134, Contracting Officer, Michael
I. LaFortune, 413/557-2134. IFB F19617-95-BA010, Project YTPM 95-7001,
M/R/A Building 1301, Pharmacy. The project consists of demolition and
complete renovation of the existing building. Installation of multiple
communication and computer lines. Replacement of electrical wiring with
explosion proof electrical wiring to include lighting, outlets,
switches and all miscellaneous electrical devices as required.
Installation of HVAC and exhaust filtration as scheduled for hazardous
material storage facilities with complete duct work, insulation and
controls. Installation of fire protection, alarm and manual pull box
alarm system. Repair of sanitary sewer lines as scheduled. Removal of
all asbestos and lead paint as scheduled. Removal of refrigeration
compressors. Replacement of all doores with double doors and single
doors, frames and hardware as required. Replacement and installation of
2 x 2 ceiling tiles. Rehab of dual use lavatory (handicapped
accessible) and shower/locker area. Install office/lobby area as
scheduled with interior painting/vinyl wall covering. Install emergency
eye wash/shower. Epoxy coat floors and 6'' up walls in hazardous
material storage areas. Install grounding points and secondary
containment ramps in hazardous material rooms. Install public address
system between office and storage areas. Repair roof, facia, and
gutters. Selective re-pointing and exterior painting and metal siding.
Security fencing around parking area. North side parking area to be
expanded to accommodate tractor trailer deliveries. Street to building
relocation of gas line is required. One job, IFB F19617-95-BA010. Bid
issue on 11 August 1995. Bid opening on 11 September 1995. Performance
period will be 180 calendar days. Estimated cost of construction is
$500,000.00 to $1,000,000.00. The proposed contract listed here is
being set-aside for 100% Small Disadvantaged Business (SDB) Concerns.
The SIC (Standard Industrial Classification) Code applicable to this
project is 1542. The small business size standard applicable to this
contruction project is a concern, including its affiliates, with
average annual receipts from its preceding three years not exceeding
$17.0 million. When requesting the solicitation, please provide your
size standard (ie) small, small disadvantaged or large business.
Telephone request will not be honored. Interested firms may request an
IFB package by submitting a written or fax request to the above
address. The fax number is (413)557-2017. Request must state your
interest as a prime contractor, subcontractor or supplier. Plans and
specifications will be furnished each bidder with the IFB without
charge and will also be available for examination at Operational
Contracting Office, 100 Logistics Dr., 2nd Flr, Suite 200, Westover
ARB, Chicopee, MA 01022-1531. (199) Loren Data Corp. http://www.ld.com (SYN# 0243 19950719\Z-0001.SOL)