Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 21,1995 PSA#1393

Army Atlanta Contracting Center, Facilities Support Section, Building 922, Fort Gillem, Forest Park, Georgia 30050-6000

Z -- WHOLE HOUSE REVITALIZATION PROJECT STAFF ROW - THE QUARTERS IN BUILDING 3 CONTAINING UNITS 3E AND 3W AND THE QUARTERS IN BUILDING 4 CONTAINING UNITS 4E AND 4W, FORT MCPHERSON, GEORGIA SOL DAKF11-95-B-0030. DUE 082395. Contact Point Jim Mullins, 404-362-7468, Contracting Officer Steven J. Sullivan. Contractor shall furnish all labor, equipment, and material and perform all work for Whole House Revitalization Project on Staff Row - Quarters 3 containing units 3E and 3W and Quarters 4 containing units 4E & 4W, Fort McPherson, GA. General: Quarters 3 and 4 were built in 1889 and are on the National Register as historic properties. Therefore, the revitalization activities will be in keeping with the craftsmanship and detailing of the period, and replacement parts will match existing in style, kind and material. Structures are both brick duplex units with a projecting one story entrance vestibule flanked by a one story entry screen porch for each unit. Each duplex unit is a 3 bedroom, 2 1/2 bath, 2 story unit with a gross area of 3,163 square feet. The quarters will be unoccupied during the period of construction. Work includes the repair/replacement of the roofs, replacing all shed and porch roof gutters and associated pvc downspouts with copper gutters and round copper unpainted downspouts. Complete repainting of interior, including all cabinet work, trim, stairs, and exterior including roof and trim; repairs to all chimneys and relining and refurbishing of one working chimney for each unit; demolition and rebuilding of existing screen porches; complete restoration of existing windows to include lead based paint abatement of window sash and all trim in contact with operable sash, staining and varnishing of stripped window sash and track. Repair and restoration of all doors and associated hardware. Repair of existing wood sheathing or structural members as required by roof replacement/repair; rewire and refurbish existing mechanical units as indicated. Reroute low voltage wiring to conceal location. Remove existing plumbing, plumbing fixtures and bathroom accessories. Install new bathroom fixtures and accessories; install new plumbing waste, vent and supply lines in concealed locations. The magnitude of this project is between $500,000 and $1,000,000. Contract completion is 210 calendar days after receipt of the Notice To Proceed. All eligible and responsible sources may submit an offer which will be considered. Written or faxed (404-363-5986) requests will be accepted. Telephone requests will not be honored. A solicitation bid opening date has not been established. It is anticipated that bid opening will be on or about 23 August 95. (200)

Loren Data Corp. http://www.ld.com (SYN# 0171 19950720\Z-0005.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page