COMMERCE BUSINESS DAILY ISSUE OF JULY 21,1995 PSA#1393DVA Medical Center (90C), 800 Poly Place, Building No. 4, Brooklyn, NY
11209-7104 Z -- UPGRADE ELEVATORS PHASE I SOL IFB 527-34-95 DUE 090895 POC
Contact Point, MARK HELLER, (718)630-3553, Contracting Officer, MARK
HELLER, (718)630-3553 Furnish all labor, materials, equipment,
transportation and supervision necessary to perform and complete
project no. 527-96-123Z entitled ''Upgrade Elevators Phase I'', at the
DVA Extended Care Center, 179th Street and Linden Blvd., St. Albans,
New York as required by drawings and specifications. This will include
the upgrade of elevators P1, P2 and P3 in building 89. Furnish all
labor, materials and supervision required to perform preventive
maintenance for all elevators (9 elevators, 1 dumbwaiter) at St. Albans
VAECC facility as required by the specifications. Maintenance to be
provided for a period of one (1) year with an option for contract
renewal for 2nd and 3rd year. Scope of work (Construction): (1) Work
includes replacing all elevator components with new as specified for
P1, P2, P3 elevators in building 89. The following components shall be
retained: Overhead gearless traction machines, deflector sheaves,
machine beams, main & counterweight rails, buffers, roller guides,
counterweights, hoisting ropes, governor ropes, hoistway entrance
frames, sills, hanger supports, strut angles, fascial plates and toe
guards, governors, slings, and car safety devices. The new components
shall include, but not be limited to: Microprocessor control system,
silicone controlled rectifying power units, cabs, traveling cables,
governor ropes, terminal stopping devices, car leveling device,
hoistway landings operating devices, car operating panels, auxillary
car operating panels, door operators, hoistway doors, hoistway and
machine room smoke detection, sump drains, and machine rooms lighting,
etc. All work shall be in accordance with ANSI code and the
specifications. (2) Provide Elevator maintenance as specified. Scope of
work (Maintenance): (1) Provide an elevator mechanic on site for 25
hours per week minimum or 5 hours per work day (Apprentice workers not
included in hours). (2) Provide all labor and materials to assure
elevator performance in accordance with standards stated in the
specifications. (3) Perform all testing as required by the
specifications and all applicable codes and regulations. Construction
cost estimate range is between $250,000 to $500,000. Standard
Industrial Classification Code is 1796, Elevator Installation,
Conversion and Repair. Construction Completion Time: 360 Calendar Days.
Solicitation to issue O/A 8/7/95. Bid opening O/A 9/6/95. All requests
for bid packages must be made in writing. (0200) Loren Data Corp. http://www.ld.com (SYN# 0174 19950720\Z-0008.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|