COMMERCE BUSINESS DAILY ISSUE OF JULY 25,1995 PSA#1395440th Airlift Wing/General Mitchell International Airport, 300 East
College Avenue, Milwaukee, WI 53207-6299 Z -- MAINTAIN/REPAIR/ALTER BASE SUPPLY FACILITY, HTUX 93-0005 A/B/C.
SOL F47606-95-BA007. DUE 091295. POC Lois L. Hess (414) 482-5273.
Maintain/Repair/Alter Base Supply Facility, HTUX 93-0005 A/B/C at the
440th Airlift Wing/General Mitchell International Airport, 300 East
College Avenue, Milwaukee WI 53207-6299. This project will have three
separate line items and will be awarded on the total aggregate bid of
those three line items. Project Maintain Base Supply Facility, HTUX
93-0005A consists of the preparation and painting of the open ware
house areas, office and passageways within the Base Supply Facility.
The open warehouse areas include the interior steel supporting
structure, exposed pipes, electrical conduit and exclosures;
stairwells, doors, handrails, interior walls and ceilings, striping,
markings and pipe labels. This project is not subject to statutory
limitations. Project Repair Base Supply Facility, HTUX 93-0005B
consists of the demolition and replacement of all fixtures, paneling,
flooring and cabinets in all toilets; re-surfacing warehouse floors
with non-skid urethane surface material; removal and replacement of
floor tile in existing corridors; providing carpeting and ceiling tiles
in offices and classrooms; a comprehensive replacement of warehouse
lighting; and the installation of window treatments. Statutory
limitations are not applicable to this project. Project Alter Base
Supply Facility, HTUX 93-0005C consists of the construction of a new
breakroom; the construction of a 150 LF by 25 FT high partition wall;
the relocation of the customer service area; extending the existing
sprinkler line branches; installing additional electrical and
communications outlets; installing vinyl wall covering and minimal
re-work of the HVAC controls and ductwork. This project is subject to
statutory limitations of $300,000. Construction magnitude for the three
projects is $250,000 - $500,000. Performance time will be 150 calendar
days after Notice to Proceed for the accomplishment of all three
projects as one effort. Solicitation will be issued on or about 10 Aug
95. This project is 100% set aside for Small Disadvantaged Business
(SDB) Concerns. Due to voluminous size of bid package, distribution in
accordance with FAR 5.102 is impractical. Local contractors must pick
up bid packages at the Contracting Office, Bldg 102, Room 102, 300
East College Avenue, Milwaukee, WI 53207-6299 between the hours of 7:00
AM-11:00 AM Monday thru Friday. Out of state requests for bid packages
must be in writing. Phone requests will not be honored. Bid packages
will be available to PRIME SDB contractors ONLY and be distributed on
a first come first serve basis. Distribution will be limited to one
package per PRIME SDB contractor. All responsible SDB sources will be
considered by the agency. (201) Loren Data Corp. http://www.ld.com (SYN# 0242 19950724\Z-0004.SOL)