Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 25,1995 PSA#1395

440th Airlift Wing/General Mitchell International Airport, 300 East College Avenue, Milwaukee, WI 53207-6299

Z -- MAINTAIN/REPAIR/ALTER BASE SUPPLY FACILITY, HTUX 93-0005 A/B/C. SOL F47606-95-BA007. DUE 091295. POC Lois L. Hess (414) 482-5273. Maintain/Repair/Alter Base Supply Facility, HTUX 93-0005 A/B/C at the 440th Airlift Wing/General Mitchell International Airport, 300 East College Avenue, Milwaukee WI 53207-6299. This project will have three separate line items and will be awarded on the total aggregate bid of those three line items. Project Maintain Base Supply Facility, HTUX 93-0005A consists of the preparation and painting of the open ware house areas, office and passageways within the Base Supply Facility. The open warehouse areas include the interior steel supporting structure, exposed pipes, electrical conduit and exclosures; stairwells, doors, handrails, interior walls and ceilings, striping, markings and pipe labels. This project is not subject to statutory limitations. Project Repair Base Supply Facility, HTUX 93-0005B consists of the demolition and replacement of all fixtures, paneling, flooring and cabinets in all toilets; re-surfacing warehouse floors with non-skid urethane surface material; removal and replacement of floor tile in existing corridors; providing carpeting and ceiling tiles in offices and classrooms; a comprehensive replacement of warehouse lighting; and the installation of window treatments. Statutory limitations are not applicable to this project. Project Alter Base Supply Facility, HTUX 93-0005C consists of the construction of a new breakroom; the construction of a 150 LF by 25 FT high partition wall; the relocation of the customer service area; extending the existing sprinkler line branches; installing additional electrical and communications outlets; installing vinyl wall covering and minimal re-work of the HVAC controls and ductwork. This project is subject to statutory limitations of $300,000. Construction magnitude for the three projects is $250,000 - $500,000. Performance time will be 150 calendar days after Notice to Proceed for the accomplishment of all three projects as one effort. Solicitation will be issued on or about 10 Aug 95. This project is 100% set aside for Small Disadvantaged Business (SDB) Concerns. Due to voluminous size of bid package, distribution in accordance with FAR 5.102 is impractical. Local contractors must pick up bid packages at the Contracting Office, Bldg 102, Room 102, 300 East College Avenue, Milwaukee, WI 53207-6299 between the hours of 7:00 AM-11:00 AM Monday thru Friday. Out of state requests for bid packages must be in writing. Phone requests will not be honored. Bid packages will be available to PRIME SDB contractors ONLY and be distributed on a first come first serve basis. Distribution will be limited to one package per PRIME SDB contractor. All responsible SDB sources will be considered by the agency. (201)

Loren Data Corp. http://www.ld.com (SYN# 0242 19950724\Z-0004.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page