COMMERCE BUSINESS DAILY ISSUE OF AUGUST 2,1995 PSA#1401Supplies Division, Third District Port Construction, Bureau, Ministry
of Transport, Kaigan-Dori, Chuo-Ku, Kobe-Shi 650, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/78/391-7577 FAX N/A product
data a industry sector code: s16 B detailed product description:
Construction Title: phase-seven Construction of wharf (13 meters deep)
in the hokko-minami area, Port of osaka; site: hokko-minami area,
konohana-Ku, osaka-Shi; summary: sand compaction piling, approx. 8,600
square meters (soil stabilization volume: over 70 and 50 percent
stabilization ratio, approx. 56,000 cubic meters; over 70 percent
ratio, approx. 36,000 cubic meters; over 50 percent ratio, approx.
6,000 cubic meters); Project control (check boring, 10 pieces), one
set; Construction period: approx. Four months (120 days); main
materials to be used: sand, approx. 62,000 cubic meters. C product
specifications/technical data: N/a (not available) D quantity: N/a e
U.S. dollar value: N/a F other information: N/a response data a
response language: Japanese. B best way to respond: letter. C from
manufacturers only: N/a D information desired from U.S. firm: N/a e
primary buying factor: the lowest bid within the estimated price range.
F other information: pre-screening is required to be eligible for
bidding. Pre-screening deadline: aug. 7, 1995. Bid documents must be
obtained directly from the procuring Agency, not from U.S. Embassy.
Payment in yen. A issuing Agency: Third District Port Construction
Bureau, Ministry of Transport B financing Agency: same as above. C
price of bid documents: N/a D purchase bid documents by: sep. 4, 1995.
E Tender number required in all communications: N/a F performance
bonds required: not required. G closed procurement procedure: no. H
bidding procedures: open competitive Tender. I bid deadline: 15:00 pm,
sep. 14, 1995. J other information: ''kensetsu kogyo shimbun'':
7/27/95. Eligible Tender participants must be: 1) firms that do not
fall under articles 70 and 71 of the cabinet order concerning Budget,
auditing, and Accounting; 2) firms pre- qualified for open competitive
bidding on Port Construction work by the Third District Port
Construction Bureau; 3) firms that score at least 1,300 points in Port
Construction work in a formula calculated from bidding company's
objective criteria at the time of application for qualification; 4)
firms that have -- since 1990, as the main contractor -- carried out
soil stabilization (of at least 70 percent stabilization ratio, 30,000
cubic meters/Project in soil volume, and 10 meters/pile in maximum
length) for the foundation of a Port structure, using a sand compaction
piling barge; 5) firms that can assign, to the Construction site, a
full-time chief engineer or engineering supervisor who meets the
following criteria: a) is qualified as a certified first-class
Construction supervisor or engineer (in Construction); B) has, since
1990, had experience with a Project as described in item (4) above as
field representative, chief engineer, or engineering supervisor; and C)
in the case of engineering supervisor, is qualified to supervise
designated Construction work; and 6) firms not currently suspended from
designation by the Director of the Third District Port Construction
Bureau. This Project is open only to pre- qualified consortia as
separately announced. Post remarks Post contact/prepared by haomori
approved by cdukelow Please send a copy of your response to: Commercial
Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337,
Refer to TC497. Please note: All correspondence with the Awarding
Authority and/or the Procuring Agency MUST be in Japanese.. (0212) Loren Data Corp. http://www.ld.com (SYN# 0134 19950801\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|