COMMERCE BUSINESS DAILY ISSUE OF AUGUST 2,1995 PSA#1401Supplies Division, Third District Port Construction, Bureau, Ministry
of Transport, Kaigan-Dori, Chuo-Ku, Kobe-Shi 650, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/78/391-7577 FAX N/A product
data a industry sector code: s16 B detailed product description:
Construction Title: Construction of wharf (14 meters deep) in the wada
area, Port of maizuru; site: wada, maizuru-Shi; summary: sand
compaction piling, approx. 1,800 square meters (soil stabilization
volume: over 70 percent stabilization ratio, approx. 55,000 cubic
meters; over 50 percent ratio, approx. 44,000 cubic meters; over 25
percent ratio, approx. 100,000 cubic meters); Project control (check
boring, 16 pieces), one set; Construction period: approx. Six months
(180 days); main materials to be used: sand, approx. 81,000 cubic
meters. C product specifications/technical data: N/a (not available) D
quantity: N/a e U.S. dollar value: N/a F other information: N/a
response data a response language: Japanese B best way to respond:
letter C from manufacturers only: N/a D information desired from U.S.
firm: N/a e primary buying factor: the lowest bid within the estimated
price range. F other information: pre-screening is required to be
eligible for bidding. Pre-screening deadline: aug. 7, 1995. Bid
documents must be obtained directly from the procuring Agency, not from
U.S. Embassy. Payment in yen. A issuing Agency: Third District Port
Construction Bureau, Ministry of Transport B financing Agency: same as
above. C price of bid documents: N/ a D purchase bid documents by:
sep. 4, 1995. E Tender number required in all communications: N/a F
performance bonds required: not required. G closed procurement
procedure: no. H bidding procedures: open competitive Tender. I bid
deadline: 14:00 pm, sep. 14, 1995. J other information: ''kensetsu
kogyo shimbun'': 7/27/95. Eligible Tender participants must be: 1)
firms that do not fall under articles 70 and 71 of the cabinet order
concerning Budget, auditing, and Accounting; 2) firms pre- qualified
for open competitive bidding on Port Construction work by the Third
District Port Construction Bureau; 3) firms that score at least 1,300
points in Port Construction work in a formula calculated from bidding
company's objective criteria at the time of application for
qualification; 4) firms that have -- since 1990, as the main contractor
-- carried out soil stabilization (of at least 70 percent stabilization
ratio, 30,000 cubic meters/Project in soil volume, and 10 meters/pile
in maximum length) for the foundation of a Port structure, using a sand
compaction piling barge; 5) firms that can assign, to the Construction
site, a full-time chief engineer or engineering supervisor who meets
the following criteria: a) is qualified as a certified first-class
Construction supervisor or engineer (in Construction); B) has, since
1990, had experience with a Project as described in item (4) above as
field representative, chief engineer, or engineering supervisor; and C)
in the case of engineering supervisor, is qualified to supervise
designated Construction work; and 6) firms not currently suspended from
designation by the Director of the Third District Port Construction
Bureau. This Project is open only to pre- qualified consortia as
separately announced. Post remarks Post contact/prepared by haomori
approved by cdukelow Please send a copy of your response to: Commercial
Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337,
Refer to TC499. Please note: All correspondence with the Awarding
Authority and/or the Procuring Agency MUST be in Japanese.. (0212) Loren Data Corp. http://www.ld.com (SYN# 0137 19950801\Y-0011.SOL)