Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF AUGUST 2,1995 PSA#1401

Supplies Division, Fourth District Port Construction, Bureau, Ministry of Transport, 4-6-1 Takezaki-Cho, Shimonoseki-Shi, Yamaguchi-Ken 750, Japan

Y -- FOREIGN GOVERNMENT TENDER: S16 CONSTRUCTION POC Tel 81/832/24-4118 FAX N/A Japan product data a industry sector code: s16 B detailed product description: Construction Title: phase-two Construction of the middle breakwater in kamasaki area, Port of gonoura; site: gonoura-Cho, iki-gun, nagasaki-Ken; summary: foundation rubble, approx. 118,000 cubic meters (five to 100 kilograms/piece); covering rubble, approx. 300 cubic meters (300 to 500 kilograms/piece); placement of caissons, two sets (approx. 2,100 tons/set); concreting of superstructure, approx. 170 cubic meters; Construction period: approx. Six months (190 days); main materials to be used: rubble, approx. 119,000 cubic meters; sand, approx. 2,500 cubic meters. C product specifications/technical data: N/a (not available) D quantity: N/a e U.S. dollar value: N/a F other information: N/a response data a response language: Japanese B best way to respond: letter C from manufacturers only: N/a D information desired from U.S. firm: N/a e primary buying factor: the lowest bid within the estimated price range. F other information: pre-screening is required to be eligible for bidding. Pre-screening deadline: 16:30 pm, aug. 4, 1995. Bid documents must be obtained directly from the procuring agency, not from U.S. Embassy. Payment in yen. A issuing agency: Fourth District Port Construction Bureau, Ministry of Transport B financing agency: same as above. C price of bid documents: N/ a D purchase bid documents by: sep. 5, 1995. E Tender number required in all communications: N/a F performance bonds required: not required. G closed procurement procedure: no. H bidding procedures: open competitive Tender. I bid deadline: 14:00 pm, sep. 14, 1995. J other information: ''kensetsu kogyo shimbun'': 7/24/95. Eligible Tender participants must be: 1) firms that do not fall under articles 70 and 71 of the cabinet order concerning budget, auditing, and accounting; 2) firms pre- qualified for open competitive bidding on Port Construction work by the Fourth District Port Construction Bureau; 3) firms that score at least 1,300 points in a formula calculated from bidding company's objective criteria at the time of application for qualification; 4) firms that have -- since 1990, as the main contractor -- installed caissons of at least 2,000 tons/piece in Construction of a breakwater; 5) firms that can assign, to the Construction site, a full- time chief engineer or engineering supervisor who meets the following criteria: a) is qualified as a certified first- class Construction supervisor or engineer (in Construction); B) has, since 1990, had experience with a project as described in item (4) above as field representative, chief engineer, or engineering supervisor; and C) in the case of engineering supervisor, is qualified to supervise designated Construction work; 6) firms not currently suspended from designation by the Director of the Fourth District Port Construction Bureau; and 7) firms not undergoing bankruptcy procedures. This project is open only to pre-qualified consortia as separately announced. Post remarks Post contact/prepared by haomori approved by cdukelow Please send a copy of your response to: Commercial Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC489.. (0212)

Loren Data Corp. http://www.ld.com (SYN# 0138 19950801\Y-0012.SOL)


Y - Construction of Structures and Facilities Index Page