COMMERCE BUSINESS DAILY ISSUE OF AUGUST 3,1995 PSA#1402Accounting Division, General Affairs Department, Okinawa General
Bureau, Okinawa Development Agency, 2-, 21-7 Maejima, Naha-Shi,
Okinawa-Ken 900, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/98/866-0031 X261 FAX N/A
product data a industry sector code: B detailed product description:
construction Title: construction of the komesu subsurface dam in the
South Okinawa agricultural irrigation project; site: komesu,
itoman-Shi, Okinawa-Ken; summary: length of construction, approx. 510
meters; breadth of Walls, 0.5 meter; area of cut-off Walls, approx.
23,500 square meters; specific temporary work, one set; construction
period: approx. 30 months (900 days); main materials to be used: ready
mixed concrete, cement (regular Portland), mechanically stabilized
slug, bentonite, and fly ash. C product specifications/ technical data:
N/a (not available) D quantity: N/a E U.S. dollar value: N/a F other
information: N/a response data a response language: Japanese. B best
way to respond: letter. C from manufacturers only: N/a D information
desired from U.S. firm: N/a E primary buying factor: the lowest bid
within the estimated price range. F other information: pre-screening is
required to be eligible for bidding. Pre-screening deadline: 17:00 pm,
aug. 10, 1995. Bid documents must be obtained directly from the
procuring Agency, not from U.S. Embassy. Payment in yen. A issuing
Agency: Okinawa General Bureau, Okinawa Development Agency B financing
Agency: same as above. C price of bid documents: N/a D purchase bid
documents by: 17: 00 pm, sep. 19, 1995. E Tender number required in all
communications: N/a F performance bonds required: not required. G
closed procurement procedure: no. H bidding procedures: open
competitive Tender. I bid deadline: 14:00 pm, sep. 28, 1995. J other
information: ''kensetsu kogyo shimbun'': 7/28/95. Eligible Tender
participants must be consortia comprised of pre-qualified firms that
meet the following criteria: 1) firms that do not fall under articles
70 and 71 of the cabinet order concerning budget, auditing, and
Accounting; 2) firms pre-qualified for open competitive bidding on
agricultural and forestry civil engineering work by the Okinawa General
Bureau; 3) firms that score at least 1,500 points in a formula for
qualification screening for agricultural and forestry civil engineering
work; 4) firms not undergoing bankruptcy procedures; 5) firms that have
-- since 1990, as the main contractor -- constructed pillar- type
underground continuous Walls of at least 40 meters in excavation depth
in a project for cut-off Walls or earth- retaining Walls, using the
on-site mixing method. Note: only construction projects in which
bidders have had a 20 percent or greater share of involvement are
eligible for consideration; 6) firms not currently suspended from
designation by the director of the Okinawa General Bureau; 7) firms not
related by capital or personnel to the contractors involved in this
project; and 8) consortia that can assign, to the construction site, a
full- time chief engineer or engineering supervisor who meets the
following criteria: a) is qualified as a certified first-class
construction supervisor under the construction business law, or
engineer in construction, agricultural engineering or forestry
engineering under the engineers law; B) has had experience with a
project as described in item (5) above; and C) in the case of
engineering supervisor, is qualified to supervise designated
construction work. Post remarks Post contact/prepared by haomori
approved by cdukelow Please send a copy of your response to: Commercial
Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337,
Refer to TC501. Please note: All correspondence with the Awarding
Authority and/or the Procuring Agency MUST be in Japanese.. (0213) Loren Data Corp. http://www.ld.com (SYN# 0159 19950802\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|