|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 4,1995 PSA#1403U.S. Army Engineer District, Europe, CETAE-CM-A, CMR 410, Box 12, APO
AE 09096 or Box 12, Konrad Adenauer Ring 39, 65187 Wiesbaden, Germany C -- MEDICAL FACILITIES DESIGN SERVICES, EUROPEAN HEALTH SERVICE
SUPPORT AREA SOL Control Number 5656 DUE 090595 POC POC for questions:
Joe Mitkevicius, 011-49-611-816-2729 SERVICES REQUIRED:
Multi-disciplined A-E services are required for planning and design of
new construction, renovation and rehabilitation, and asbestos
abatement studies and remediation design of medical, dental, and
veterinary facilities in Germany, Belgium, Italy and the Netherlands.
A-E services may also be required for construction supervision and
inspection. It is anticipated that one Indefinite Delivery Type (IDT)
contract will be awarded as a result of this announcement. The contract
will be valid for one year, and will include an option clause in
accordance with the Federal Acquisition Regulations making possible an
extension for an additional year. One-year, not-to- exceed limits of
$ 500,000 will apply. Individual delivery orders will not exceed
$100,000. Anticipated contract award November 1995. PROJECT
INFORMATION: No specific project information exists due to the nature
of Indefinite Delivery Type (IDT) contracts. SELECTION CRITERIA: See
Note 24 for general selection process. The selection criteria, listed
in order of importance, are: (A) Specialized experience and technical
competence within the last five (5) years in: Design of
repair/rehabilitation and alteration of medical and dental facilities
to include life safety and utility upgrades of existing operation
facilities; surveying medical and dental facilities for life safety
deficiencies (NFPA 101 specifically) to include related reports and
equivalency studies; and construction supervision and inspection. (B)
Adequate professional personnel in sufficient numbers to handle several
simultaneous delivery orders. Personnel required: Architects, civil,
electrical, mechanical and structural engineers, medical facility
planners, certified industrial hygienists, cost estimators and
construction inspectors. The firm must show that the personnel are
accredited in applicable U.S. and host nation regulations for asbestos
design, survey work and management planning. (C) Proven capability to
perform overseas projects, primarily at U.S. medical facilities in
Europe. (D) Management Plan: This plan must show in block 10 of the SF
255, as a minimum, details of lines of supervision and communication,
and working relationships between teams, particularly Joint Venture
Partners and Sub-consultants. (E) Past performance on Department of
Defense and other contracts with respect to cost control, quality of
work and compliance with performance schedules. (F) CADD Capability:
Firm must have capability to provide all project plans on electronic
media in a format compatible with Autocad, Version 12. A summary of the
firm's CADD capability must be included in Paragraph 10 of the SA 255.
(G) Volume of DOD contract awards in the last 12 months as described
in Note 24. SUBMISSION REQUIREMENTS: See Note 24 for general submission
requirements. Firms which meet the requirements described in this
announcement are invited to submit a SF255, and a SF254, (Separate SF
254's are required for each Partner in a Joint Venture) with their
letter of interest to this office. Only the Nov 92 (11/92) edition of
the SF 255 and SF 254 will be accepted. A current (within one year old)
SF 254 for each firm shown in Block 6 of the SF 255, ''Outside Key
Consultants or Associates'', is also required. Firms will be rejected
for outdated SF254's. Block 4 of the SF 255 must show only the staff
(including all sub-consultants) available to perform the anticipated
work. Disciplines shown on the SF255 and SF254 must clearly delineate
full time, free-lance and subcontracted personnel on the staff of each
firm. All submissions are to be made in one copy. Do not include
promotional brochures, advertisements, or other extraneous material in
your submissions. Limit the total number of project examples to 10 in
the SF 255 and 30 examples in the SF 254 as specified in the
instructions. Limit resumes under Par. 7 of SF 255 to 1 or 2 key
personnel in each required discipline. Limit Par. 10 of SF 255 to 10
pages or less. Include your firm's FAX# in the submittal. All
submittals must be received in this office by COB (1630 hrs local time)
thirty (30) days after publication of this announcement in the Commerce
Business Daily. If the 30th day is a Saturday, Sunday, or U.S. Federal
Holiday, the deadline is the close of business of the next business
day. Please note: Firms sending submittals via air courier service
should state the content value to be no cost or zero. If a monetary
value is indicated on the package, the package will be delayed due to
customs clearance. Europe District is not responsible for such delays
which affect late receipt of submittals. Europe District Telefax No is
011-49-611-816-2730. No other general notification to firms in the US
will be made. Personal visits to discuss this project will not be
scheduled. This announcement has been simultaneously announced in
Europe. No further action beyond submission of the SF255 and SF254's is
required or encouraged at this time. This is not a request for
proposal. No written or telephone requests for a solicitation package
will be accepted or responded to. (0214) Loren Data Corp. http://www.ld.com (SYN# 0014 19950803\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|