Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF AUGUST 15,1995 PSA#1410

VA MEDICAL CENTER, 3495 BAILEY AVENUE, BUFFALO, NY 14215

Z -- INSTALL ETO EMISSIONS CONTROL EQUIPMENT. SOL 528-12-95 DUE 092595 POC Contact Point, CHERIE WIDGER-KRESGE, (716)862-3656, Contracting Officer, CHERIE WIDGER-KRESGE, (716)862-3656, Additional Contact, TERRY KENDRICK, (716)862-3496 Provide all labor, materials, supervision, and equipment required to install an ETO emissions control system the VA Medical Center, Buffalo, NY as required by the plans and specifications. Work includes, but is not limited to: demolition, HVAC, electrical systems, finishes, and installation of two abators. The bid package will be issued 08/25/95 and the Bid Opening is scheduled for 09/25/95 at 12:00p.m. in Room 67C (Basement). There is a prebid conference scheduled for 9:00a.m. on 09/08/95 in Room 104A (first floor). NOTE: THIS PROJECT IS SET-ASIDE FOR LABOR SURPLUS AREA FIRMS. THIS IS NOT SET-ASIDE FOR SMALL BUSINESS. To receive a bid package, submit a written request indicating company's name, street address (no post office box), telephone number, fax number, and bid deposit of $25.00 (Company or Cashier's Check - NO CASH) endorsed to the U.S. Dept. of the Treasury to the attention of the Contracting Officer. The bid deposit is refundable upon return of the bid package. Award is subject to the availability of funds. Construction performance period is 270 calendar days. A ninety (90) calendar day bid acceptance period is required. Estimated Construction Cost is: Between $100,000 and $250,000. (0223)

Loren Data Corp. http://www.ld.com (SYN# 0098 19950814\Z-0006.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page