COMMERCE BUSINESS DAILY ISSUE OF AUGUST 24,1995 PSA#1417US Army Corps of Engineers, Ft. Worth District, Fritz G. Lanham
Building, 819 Taylor Street, Room 6A18, P. O. Box 17300, ATTN: CESWF-
ED-MC, Fort Worth, TX 76102-0300 C -- IDC FOR MULTIDISCIPLINE DESIGN SERVICES FOR (PRIMARILY
MECHANICAL/ELECTRICAL) PROJECTS ASSIGNED TO THE FORT WORTH DISTRICT
(PRIMARILY FORT SAM HOUSTON, TX) SOL DACA63-95-R-0076 POC Sharon
McLellan (817/334-3939). 1. CONTRACT INFORMATION: The work may involve
Design, Drafting, Planning, Studies and Site Investigation associated
with this type of project. All work must be done by or under the
direct supervision of licensed professional Engineers or Architects.
The work under this contract is anticipated to begin in January 1996
and run for twelve months with a 12 month option. Estimated A-E Fee
Including Option: $1,500,000.00 maximum ($750,000.00 basic, $750,000.00
option), with a maximum Delivery Order amount of $150,000.00. If a
large business firm is selected for this announcement it must comply
with the FAR 52.219-9 clause regarding the requirement for a
subcontracting plan. The Fort Worth district goal on work to be
subcontracted is that a minimum of 60.3% of the Contractor's total
intended subcontract amount be placed as follows: 9.8% be placed with
Small Disadvantaged Businesses (SDB), 2.9% be placed with Women Owned
Small Businesses (WOB) and the remaining 47.6% be placed with Small
Businesses (SB) for a total of 60.3%. The plan is not required as part
of this submittal. The proposed services will be obtained by
Negotiated Fixed Price Contract. Projects outside the primary area of
responsibility may be added at the Governments discretion upon
agreement of the selected firm. 2. PROJECT INFORMATION: The work may
involve Design, Drafting, Planning, Studies and Site Investigations
associated with an Indefinite Delivery Contract for projects which are
primarily of a Mechanical/Electrical nature. Projects are expected to
be for maintenance, repair or alterations to existing facilities
and/or small new construction. Work may also include designs/studies
for environmental or EPA considerations. Services during a project's
construction phase may also be required. 3. SELECTION CRITERIA: See CBD
Note 24 (Monday issue) for general description of selection process.
Selection criteria in descending order of importance are as follows:
(a) Professional Capabilities: This type of Indefinite Delivery
Contract will require, (either in-house or through consultant) as a
minimum, the following: Two Architects, three Electrical, three
Mechanical, two Civil and two Structural Engineers, Cost Estimating and
Surveyors, Environmental Design/Remediation Expertise, lab testing, air
monitoring and design to Fire Protection/Life Safety codes. (b)
Specific Experience and Technical Competence: The selected team must
demonstrate extensive experience in the design of repair, renovation or
alteration of existing facilities and infrastructures, steam
distribution and utility systems, HVAC systems, and small new
construction. Firms must show experience in evaluating contractor's
submittals and construction surveillance. Firms must have at least two
year's experience in Fire Protection/Life Safety Design and be
familiar with the use and application of NFPA codes 80 and 101 and
MIL-HDBK-1008B. Demonstrate experience in working with a testing
laboratory to design for water quality, removal of friable asbestos and
remediation of lead-based paint hazards and underground toxic
substances. (c) Firms must show adequate team capacity to design 3
Delivery Order concurrently meeting all schedules. (d) Demonstrate past
performance with respect to cost control, quality of work, and
compliance with performance schedules. (e) Geographical Location: Firms
must show familiarity with Fort Sam Houston, TX and the surrounding
area and must address fast response capabilities. (f) Specifications
and construction cost estimates prepared on IBM compatible equipment.
Construction cost estimates prepared using our PC based computer Aided
Cost Estimating System (M-CACES) (Software will be provided). Computer
Media for a Computer Aided Design and Drafting (CADD) system (Auto CADD
or Intergraph compatible). In Block No. 10 of the SF 255, show last 12
month's Department of Defense awards. (g) Extent of participation of
SB, SDB, and WOB in the proposed contract team, measured as a
percentage of the estimated effort. (h) Block No. 10 will be limited to
ten pages maximum. 4. SUBMITTAL REQUIREMENT: (a) See Note No. 24 for
general submission requirements. Interested firms must provide one
submittal package including an original SF 254 and SF 255 no later than
4:30 p.m. on the 30th day after the date of this announcement to be
considered. The Nov 92 version of the forms must be used. If the 30th
day is a Saturday, Sunday or Federal Holiday, the deadline is 4:30 p.m.
of the next business day. (b) Responding firms must submit a current
and accurate SF 254 for themselves and each proposed consultant. It
must be provided for the specific office proposed to do the work.
Indicate in Block No. 4 of SF 254 if your firm is a Large, Small, Small
and Disadvantaged or Woman-Owned Business. To be classified as a small
business, a firm's average annual receipts or sales for the preceding
three fiscal years, must not exceed $2.5 million. (c) Submit only one
SF 255, completed in accordance with the instructions. It must contain
information in sufficient detail to identify the team (prime and
consultants) proposed for the contract. (d) Include CBD announcement
number in Block NO. 2b of the SF 255. (e) In Block No. 4 of the SF 255,
insert the number of personnel proposed for the contracts (not
necessarily total capacity), Consultants as (A) and in-house as (B).
(f) In Block No. 6 of the SF 255, identify the discipline/ service to
be supplied by each consultant. Provide brief resumes of the on-staff
or consultant employees you intend to use to perform the work in the
anticipated design time and the type of projects they will perform in
Block No. 7 of your SF 255. Block No. 7 may be repeated as needed to
identify all the major disciplines and key team members. Selection will
be based on the total team members presented in your SF 255, primarily
in Block No. 4. Resumes must be submitted for all personnel listed in
Block No. 4 to meet the minimums stated in 3b. (g) In Block No 10 of
the SF 255, include a draft Design Quality Control (DQC) Plan. It
should include a brief presentation of internal controls and procedures
that you use to insure that a quality design is produced. (h) Personal
visits to discuss this project will not be scheduled. (i) Solicitation
packages are not provided for A-E contracts. This is not a request for
proposal (see Note No. 24). (0234) Loren Data Corp. http://www.ld.com (SYN# 0024 19950823\C-0012.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|