Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 1,1995 PSA#1423

U.S. Army Aviation and Troop Command 4300 Goodfellow Blvd. St. Louis, Missouri 63120-1798

61 -- POWER SUPPLY ASSEMBLY SOL DAAJ09-95-R-0673 DUE 101595 POC Evelyn Kelley, Contract Specialist, (314)263-0792, FAX 314-263-9012 Marilyn J. Bladdick, Contracting Officer (314)263-0795. NSN: 6130-01-169-4285, PN: 13078110, Quantity 57 each, applicable to the AH-64 Aircraft (TADS/PNVS System). This proposed contract action is for supplies for which the Government does own specifications and drawings. Firms that recognize and can produce the required items described above are encouraged to identify themselves to the Contracting Officer and provide supporting evidence which will permit their participation in the current or future requirment. The Government's required delivery schedule is as follows: The First Article Test Report is due 228 days ADC, delivery of 1 each 378 days after date of contract award, and 56 each 408 days after date of contract award. Delivery without First Article would begin 210 days ADC at 57 each. All assets will be delivered to The US Army AH-64 Support CTR, 1700 Tradeport Drive, Orlando, Florida. All responsible sources may submit a quote which shall be considered by the Agency. This requirement is set-aside 100% for small businesses. See Numbered Note(s): 1. (0242)

Loren Data Corp. http://www.ld.com (SYN# 0277 19950831\61-0004.SOL)


61 - Electric Wire and Power and Distribution Equipment Index Page