|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 6,1995 PSA#1425U. S. Army Engineer District, Savannah, ATTN: CESAS-EN-EA, P.O. Box 889
(31402-0889) or 100 W. Oglethorpe (31401-3640), Savannah, Georgia C -- JSTARS ADAL AIRCRAFT APRON/HYDRANT FUEL SYSTEM INSTALLATION AND
LOCATION, ROBINS AFB, GA POC Derek Cudd at 912/652-5688. 1. CONTRACT
INFORMATION: A-E services are required for site investigation,
planning, engineering studies, concept, preliminary design, final
design, and shop drawing review. This will be a firm fixed price
contract. The contract is anticipated to be awarded in October 1995 and
completed in October 1996. The estimated construction cost range is
$5,000,000 to $10,000,000. 2. PROJECT INFORMATION: A-E Services are
required for Design of JSTARS ADAL Aircraft Apron/Hydrant Fuel System
Installation and Location, Robins AFB, GA. Subject projects involves
adding to and altering the existing apron and relocating ramp lighting
for Joint Stars E-8 aircraft. remove/replace apron and shoulders as
needed to install fuel laterals and hydrants. Provide 10 new hydrants
and 5 new laterals with connections to the new fuel main, and increase
pumping capacity in the fuel pumping station. 3. PRIMARY CRITERIA: See
Note 24 for general process. The selection criteria in descending order
of importance are: a. Specialized experience in the type of work
described in Project Information. The estimates for this project shall
be prepared using the latest Version of MCACES Gold Software. The
software and User's Manual will be provided by the Savannah District
free of charge to the successful A-E. The drawings will be prepared
using graphics created via Microstation 32 or Micro/Station PC (4.0)
and/or AutoCADD Version 11. All drawings delivered to the District that
have been created using AutoCADD Version 11 must be translated to .dgn
files. The Contractor shall possess the software to enable the full
translation of drawing files from .dwg to .dgn and vice versa. Before
final selection the preselected A-E's may be required to demonstrate
the above compatibility by reproducing a Government supplied standard
drawing and translating it to the Intergraph format stated above. The
method of translation must be thoroughly described and documented in
Block 10 of the SF 255 if the A-E does not have an Intergraph CADD
System. The A-E firm selected will be required to submit a Design
Quality Assurance Plan concurrently with their fee proposal. Infomation
on what is to be contained in this plan will be furnished upon
notification of selection. Firms responding to this announcement are
requested not to transmit this plan with their SF 255. b. Past
performance on DoD and other contracts with respect to cost control,
quality of work, and compliance with performance schedules. c. Capacity
to accomplish the work in the stated contract period and to dedicate at
least 2 structural engineers, 2 mechanical engineers, 1 civil engineer,
1 electrical engineer and 2 topo survey crew. The design team must
include a Registered Engineer or Registered Architect who is a full
''member'' in good standing of the Society of Fire Protection Engineers
(SFPE) or an individual who is a registered Fire Protection Engineer
and whose principal duties are Fire Protection Engineering. d.
Professional qualifications of key management and professional staff
members. e. Knowledge of the locality as it pertains to design and
construction methods for roofing systems in NC, SC & GA. SECONDARY
CRITERIA: f. Extent of participation of SB, SDB, WO, historically black
colleges and university and minority institutions in the proposed
contract team, measured by percentage of the estimated effort. g.
Location of the firm in the general geographic area of the project. h.
Volume of DoD contract awards in the last 12 months as described in
Note 24. 4. SUBMITTAL REQUIREMENTS: See Note 24 for general submission
requirements. Interested firms having the capabilities to perform this
work must submit ONE copy of SF 255 (11/92 edition) for PRIME and ONE
copy of SF 254 (11/92 edition) for the prime firm and all consultants,
to the above address by 04 October 1995 to be considered for this
selection. Include the firm's ACASS number on the SF 255, Block 3b. For
ACASS information, call 503/326-3459. DEPTH of PRIME and SUBCONTRACTOR
personnel in EACH discipline must be SHOWN in Block 4 of SF 255 and SF
254 to CLEARLY identify the NUMBER of PERSONNEL in each firm and
DISCIPLINE. COVER letters and extraneous materials are NOT desired and
WILL NOT be considered. PHONE calls are DISCOURAGED unless ABSOLUTELY
necessary. PERSONAL visits for the PURPOSE of DISCUSSING this
announcement WILL NOT be scheduled. This is NOT a REQUEST for a
PROPOSAL. (0244) Loren Data Corp. http://www.ld.com (SYN# 0015 19950905\C-0007.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|