|
COMMERCE BUSINESS DAILY ISSUE OF september 25,1995 PSA#1438Planning Group Procurement and Supply Department NTT. Marukin Bancho
Bldg. 5F 6-28 Rokuban-cho Chiyoda-ku, Tokyo 102 JAPAN 95 -- JAPAN: CONCRETE POLE Due 101695. POC NTT America, Inc.,
Corporate Headquarters, 101 Park Avenue, 41st Floor New York, NY 10178,
212/661-0810 also NTT America Inc., Pacific and Western Division 800 El
Camino Real West, Suite 103 Mountain View, CA 94040, 415/940-6565. This
public notice is to request suppliers to provide NTT with general
referential information on similar products or technology prior to
procurement of the intended product (mentioned below) by NTT. This
public notice is also to request that any suppliers wishing to
participate as a subcontractor in the procurement program of this
product should declare their intentions to that effect. This public
notice is not intended to guarantee public notification of procurement
of this product. (1) Name: Concrete Pole. (2) Overview: This product
is the supporter of one concrete pipe for aerial telecommunication
line. (3) Description of the Request for Information: Applicants are
requested to supply NTT with the following information on similar
products, or on technology relating, to the product
previously-mentioned above. (However, entire supplied information will
be regarded as non-secret information and may be disclosed to third
parties in the form of, for example, inclusion in the corresponding
Procurement Documentation, or may become available to third parties.
Regardless in such cases, NTT will not assume any responsibility for
possible outcomes arising from the management, disclosure, or use of
the supplied information.) (i) Technical information: (i) -a. Main
feature (i) - b. Main directions for use (i) - c. External form
(compositions/structure), Weights (i) -d. Service function list
(supporting position and method of lines/Installing standard of step
bolts/Installing method and position of supporting hard ware) (i) -e.
Reference standard (i) - f. Physical dimensions (Structure
strength/earth bearing capacity for pole/capacity of corrosion
protection) (i) -g. Reliability (i) -h. Ability of leading an earth
wire through the concrete pole (i) -i. Stress corrosion cracking of
PC-steel materials (ii) Prices: Price per unit. (iii) Standard time of
delivery after ordering (iv) Others: (iv) -a. Records of sale and
installations (iv) -b. Plan for enhancement (iv) -c. Maintenance (iv)
-d. Active proposals likely to become useful for increasing the
business of NTT. (4) Request for Declaration of the Intention of
Subcontracting: Any suppliers wishing to participate as a subcontractor
in the product procurement program of NTT are requested to supply NTT
with the information listed below. After preparing a list of supplied
information, NTT will provide the list to applicants interested in
obtaining it; to those who have responded to the request for supply of
the information listed in Item (3); and to those who have purchased
the Procurement Documentation to procurement of the product. Howeer,
NTT will not assume any responsibility for possible outcomes arising
from supply of the list. (i) Name of the applicant (ii) Place of
contact (Address, name of the person in charge, telephone number, and
facsimile number) (iii) The products and/or services that the applicant
can supply as a subcontractor (5) Time Limit of Acceptance of the
Offers for Supply of Information and for Declaration of the Intention
of Subcontracting; 3:00 p.m., October 16, 1995 (This time limit also
applies to mailed offers. (6) Language To Be Used: Japanese or English.
(261) Loren Data Corp. http://www.ld.com (SYN# 0343 19950922\95-0003.SOL)
95 - Metal Bars, Sheets and Shapes Index Page
|
|