|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 27,1995 PSA#1440USDA-Soil Conservation Service, 101 South Main, Temple, TX 76501-7682 Y -- FORT HOOD EROSION CONTROL MEASURES, CORYELL CO, TEXAS SOL
NRCS-1-TX-96 DUE 110895 POC Contact Point, Contract Section,
(817)774-1221, Contracting Officer, James Stautzenberger,
(817)774-1221, Additional Contact, Jean Whitis, (817)774-1221
Construction of three sediment control structures, Sites 34A1, 35B1,
and 35B2, Fort Hood Erosion Control Project, located approximately 6 to
8 miles North of Copperas Cove, Coryell County, Texas. The major items
of work are excavation, unclassified, 7,558 Cu. Yd.; earthfill, 65,929
Cu. Yd.; two principal spillway structures consisting of 11.5 Linear
Ft. of 42'' I.D. CMP, 135 Linear Ft. of 24'' I.D. CMP, 12.5 Linear Ft.
of 60'' I.D. CMP and 139 Linear Ft. of 36'' I.D. CMP; two access
roads; and construction surveys. Performance time is 157 calendar days.
The estimated Price Range is $100,000.00 to $250,000.00. All
responsible sources may submit a bid which shall be considered by the
agency. (0268) Loren Data Corp. http://www.ld.com (SYN# 0125 19950926\Y-0009.SOL)
Y - Construction of Structures and Facilities Index Page
|
|