|
|
|
Y - Construction of Structures and Facilities
AWARDS
- REPLACE BED BUILDING, VA MEDICAL CENTER, MUSKOGEE,
- CONSTRUCT WATER LOOP MAIN, HANGARS 4 & 5
- CONSTRUCTION OF PROJECT NO. QIR 26(14); GRADE, DRAIN
- AWARD NOTICE - MULTI-TRADE CONSTRUCTION AT NAVAL
- REPLACE SIDING, BUILDING 307, NAVY SHIPS PARTS CONTROL
- CONSTRUCT FACILITY AND INSTALL GOVERNMENT FURNISHED
- REPAIR/PAINT WATER TOWER, STRUCTURE NO 236, ROCK
- INSTALL FIRE PUMP AND TANK, BUILDINGS N179 AND N179A,
- CONSTRUCT COVERED STORAGE AREA, ECS, FORT MCCOY, WI
- POTABLE WATERLINES SYSTEM, TRACY PUMPING PLANT, DELTA
- CONSTRUCT CONCRETE APRON, FORT MCCOY, WI
- RENOVATION OF THE NATIONAL WEATHER SERVICE'S (NWS)
- PARKING APRON AND HYDRANT REFUELING SYSTEM
- ADAL VEHICLE MAINTENANCE/COMMUNICATIONS-ELECTRONICS
- CONSTRUCT LATRINES & GRAY WATER DISPOSAL FACILITIES
- ASBESTOS ABATEMENT, IDAHO FALLS, IDAHO
- MISCELLANEOUS REPAIRS TO MOLINE BRIDGE STRUCTURE NO
- RENOVATION OF BOSTON STORE, CUYAHOGA VALLEY NATIONAL
- COLUMBIA RIVER TREATY FISHING ACCESS SITES
- PAVE ROAD 1040 BRIDGE APPROACHES
- PERIMETER FENCE REPAIR, JEFFERSON PROVING GROUND,
- 600 BLOCK TRIM REPAIRS, FT BENJAMIN HARRISON, IN
- BUILDING 300 CONVERSION/RENOVATION, FT BENJAMIN
- WASTEWATER TREATMENT PLANT UPGRADE, FORT MCCOY,
- BUILD A MILITARY EQUIPMENT PARKING LOT
- DREDGE MATERIAL DISPOSAL AREA, VERDIGRIS RIVER, OK
- SOF LANGUAGE SUSTAINMENT FACILITY, FT. BRAGG, NORTH
- BUILD A DEP MED AT FT SHERIDAN, IL
- BUILD DEP MED TRAINING FACILITY AT BARTONVILLE, IL
- QUEMADO WATERLINES AND STORAGE TANKS
- ROADS CONSTRUCTION
- CONSTRUCT MEDIUM-INTENSITY APPROACH LIGHTING SYSTEM
- COMPOSITE SQUADRON OPERATIONS
- CONSTRUCT HAZMAT PHARMACY
- CONSTRUCT INTEL/SCIF
- INSTALL HEATING SYSTEM TO INDIAN HEALTH SERVICE
- DESIGN/BUILD - NEW CARRIER ANNEX - BARTLETT/HANOVER
- REFRIGERATION, LIGHTING UPGRADE AND MINOR CONSTRUCTION
- METAL WAREHOUSE
- OZONE PRODUCTION BUILDING
- CONSTRUCTION OF ESSB FACILITY
- INSTALL WAVE OFF LIGHTS, RUNWAY 18/36 AT OLF CHOCTAW,
- OPERATIONS/ACTS SUPPORT FACILITIES
- INSTALL VEHICLE VENTILATION SYSTEM
- CONSTRUCTION OF A 570 CUBIC METER INSULATED, ELEVATED
- BIG 4, PHASE II, DARRINGTON RANGER DISTRICT
- NEW CONSTRUCTION LEASED AT MELFA, VIRGINIA
- SIUYA TIMBER SALE SITE RESTORATION.
Today's CBD Index Page
Created on September 28, 1996 by Loren Data Corp. --
info@ld.com
|
|
|