COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 24,1995 PSA#1458U.S. Department of Labor, ETA, Division of Acquisition and Assistance,
200 Constitution Avenue, NW, Room S-4203, Washington, DC 20210 Y -- PY 94 NEW CENTER Sol IFB-96-DAA-06-JC, Due 122095, contact, Theo
Pappas (313) 963-5906, or Serena Proctor (202) 219-8706. New center
construction for the Flint Job Corps Center in Flint, Michigan. The new
center shall provide academic, administration, vocational,
medical/dental, recreational, food service, storage/support and housing
facilities. There are five buildings to be constructed on existing
footings and foundations, including associated site and utility work.
These buildings include: Administration/Medical/Dental - Building ``A''
(11,435 GSF); Education/Vocational - Building ``C'' (26,889 GSF); and
two Dormitories - Buildings ``D'' and ``F'' (28,241 GSF Each). Also, at
the owner's option, a Single-Parent Dormitory - Building ``G'' (28,241
GSF) and Child Development Center - Building ``H'' (8,530 GSF) will be
included. Alternatives will be included as well. The estimated cost
range of construction is $10,000,000 to $15,000.000. The estimated
construction time is 421 calendar days. Plans and Specifications will
be available on November 8, 1995, from the office of the
Architect/Engineer, William Kessler & Associates, Incorporated, 409 E.
Jefferson Avenue, Suite 600, Detroit, Michigan 48226, Contact Theo
Pappas at (313) 963-5906 for additional information regarding this
project. Collect calls will not be accepted. It is emphasized that
requests for plans and specifications shall be directed to the A/E firm
listed above to ensure proper handling of requests. Request must be in
writing and a $300.00 refundable bid-deposit is required. This
bid-deposit must be in the form of a certified check, cashier's check,
or money-order, made payable to the U.S. Department of Labor, and
submitted to the A/E firm at the time of request. Requests will be
answered on a first-come, first-serve basis until supplies are
exhausted. For requests made after the supply is exhausted, the
Contracting Officer may determine whether payment of a fee is
warranted. The non-refundable fee shall not exceed the actual cost of
duplication of the IFB documents, plus COD charges. A pre-bid walk-thru
is scheduled for November 29, 1995, at 10:00 a.m. local time. Bid
Opening Date is December 20, 1995, at 2:00 p.m. local time. This is a
100% Small Business set-aside. The SIC Code is 1542. See Numbered
Note(s) 1. (293) Loren Data Corp. http://www.ld.com (SYN# 0078 19951023\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|