COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 25,1995 PSA#1459D. Dale, Contracts Specialist, Brookhaven National Laboratory,
Contracts & Procurement, Building 355, Upton, NY 11973-5000 Z -- UPGRADE ELECTRICAL SUBSTATIONS POC Contact Point, David Dale,
(516)282-3199 This contract will be set aside for bidding by small
businesses only. SIC code 1731 applies. Work consists of the following:
Loss Prevention Upgrades Electrical Substations (Contruction Package
CP-1) LI-MEL-FS - Modifications to approximately forty-nine (49)
existing BNL substations tobring them into compliance with Factory
Mutual and IEEE 980 compliance. The upgrades shall include all
materials and labor required for proper installation and operation.
Items included shall be the addition of area grading and site
preparation, underground electrical raceway, manholes, concrete
foundations, concrete containment pit, fire walls, fencing, cable,
installation of substation and distribtion type transformers, HV/LV
switchgear, HV/LV Terminations, exothermic grounding, testing and
startup associated with subject equipment. Contractor will be required
to move the electrical equipment provided by BNL from BNL's staging
area to the individual substation areas. All work will be awarded on a
single contract. Estimated procurement and installation cost is
$1,000,000. Estimated construction time is 30 weeks. Bid documents will
be available on or about December 18, 1995. A 20% bid bond is required.
Payment and performance bonds are required after contract award.
Brookhaven is charging a non-refundable fee of $100 for bid documents
documents. Personal checks made out to ''Brookhaven National
Laboratory'' are acceptable. Checks may be sent out immediately and bid
packages will be mailed upon availability. Requests for bid packages
received without proper payment will not be acknowledged. (0296) Loren Data Corp. http://www.ld.com (SYN# 0097 19951024\Z-0013.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|