0212) Y -- FY94 MCON PROJECT P-468, PHASE III, INDUSTRIAL WASTE TREATMENT
COMPLEX FOR NAVY PUBLIC WORKS CENTER, PEARL HARBOR, HAWAII SOL
N62742-94-B-1320 DUE 121595 POC Contact Roxanne Vannatta, Procurement
Technician, Jane Nishiguchi, Contract Specialist, (808) 474-7320 The
work includes the construction of the IWTC which consists of four
separate buildings (Administration/Process Control Laboratory Building,
Treatment Building, Oxygen Breathing Apparatus (OBA Building, and
Utility Building). It also includes the construction of an Off-Site
Parking lot. The IWTC site improvements include some demolition of
existing pavement and utilities as well as installation of the new
underground utilities and pavement. The site work will also include the
installation of high voltage switchgear, oil flooded transformer, and
low voltage switchgear. The building structures will require over
excavation and imported select fill for the foundations. The Admin/PCL,
Treatment, and Utility buildings will be pre- engineered metal building
structures with pre-finished metal roof and fascia. The OBA building
will be a concrete structure with explosion skylights and pre-finished
exterior siding and fascia. All the buildings include construction of
interior and exterior finishes, flooring, wood and steel doors, gypsum
wallboard partitions, industrial ventilation and exhaust systems,
plumbing, wet pipe heat activated fire extinguisher systems, electrical
wiring and lighting, fire alarm systems, exterior pavement and
improvements, and incidental related work. The Admin/PCL building will
include air conditioning, and laboratory casework and furnishings. The
Treatment building will include process equipment to conduct the
treatment of waste waters. This equipment will include steel and
fiberglass tanks, centrifugal, progressive cavity, and metering pumps,
a campus compressed air system, and various process equipment skids.
The OBA building will be the only electrically classified structure at
Class II Division II. The Utility builing will include an engine
generator with sub-base fuel tank as well as electrical equipment.
Remove the construction barriers at the completion of the work.
Estimated cost is more than $10,000,000. THE SIC CODE FOR THIS
PROCUREMENT IS 1541 AND THE ANNUAL SIZE STANDARD IS $17 MILLION. LARGE
BUSINESS CONCERNS ARE REQUIRED TO SUBMIT A SUBCONTRACTING PLAN WITH
SMALL BUSINESS AND SMALL DISADVANTAGED BUSINESS CONCERNS PRIOR TO
AWARD. Requests for copies of this solicitation must be postmarked not
later than 15 days from the date of publication of this synopsis in
the CBD. Requests postmarked later than that date may not be honored.
REQUESTS MAY BE MADE BY LETTER WITH CHECK IN THE AMOUNT OF $100.00 FOR
EACH SOLICITATION TO PAYEE: U.S. TREASURY. THERE WILL BE NO REFUND
SHOULD THERE BE A CANCELATION AFTER ADVERTISEMENT. Availability of the
solicitation is limited and will be furnished on a first- received,
first-served basis. Please furnish info whether firm is interested as
a Prime contractor or Subcontractor. FAX# (808) 474-7316. Bid opening
date is approx. Synopsis #2. (0299) Loren Data Corp. http://www.ld.com (SYN# 0080 19951027\Y-0001.SOL)