COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 1,1995 PSA#1464U. S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-CT (PLANS ROOM NO.
1000A), P. O. BOX 2288 MOBILE ALABAMA 36628-0001, OR 109 ST. JOSEPH
STREET MOBILE AL 36602 Y -- INDUSTRIAL WASTEWATER TREATMENT PLANT CORRECTIONS PHASE I,
HOLSTON AAP, TN SOL DACA01-96-B-0028 DUE 121495 POC Contact Mr. Earl E.
Davis, 334/690-2535; Contracting Officer, Gene L. Curtis (Site Code
W31XNJ) The work consists of the construction of a new aeration basin,
installation of a new industrial pump, replacing two existing
industrial pumps and replacement of 5,700 feet of underground
Polyethylene Force Main with 24- inch diameter aboveground stainless
steel force main. Critical Path Method (Network Analysis System) is not
required. Bid documents are available ion or about 14 November 1995.
Costs are as follows: Plans half size $11.00. Specifications $39.00.
Estimated cost of work is between $1,000,000 and $5,000,000. Requests
for Plans and Specifications shall indicate in writing whether firm
will bid as a Prime contractor or a Subcontractor. Unrestricted. All
responsible sources may submit a bid which shall be(0303) Loren Data Corp. http://www.ld.com (SYN# 0101 19951031\Y-0011.SOL)
Y - Construction of Structures and Facilities Index Page
|
|