COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 1,1995 PSA#1464U. S. Department of Labor, ETA, Division of Acquisition and Assistance,
200 Constitution Avenue, NW, Room S-4203, Washington, DC 20210 Z -- VENTILATION AND LIGHTING UPGRADES AT THE WESTOVER JOB CORPS
CENTER Sol. IFB-96-DAA-08-JC. Due 121395. POC: Will Spears, Architect,
(617) 338-5350; or Kenneth S. Graves, Contract Specialist, (202)
219-8706. This project consists of the replacement of the exhaust
system in the toilet rooms of three buildings (Nos. 5902, 5903, and
5904) and the upgrading of the lighting system in one building (No.
5908) at the Westover Job Corps Center located in Chicopee,
Massachusetts. The work involves the removal of through wall exhaust
fans; the termination of existing power wiring and removal of the
existing timer and junction boxes; the installation of new exhaust fans
in the toilet rooms; the undercutting of toilet room doors; and the
installation of new emergency lighting, wiring, conduit, and junction
boxes. The period of performance for construction is 210 calendar days
from receipt of notice to proceed through completion of the project.
The estimated cost range of construction is between $100,000.00 and
$250,000.00. Initial Plans and Specifications will be available on
November 9, 1995, only from the Architect/Engineer firm of Miller Dyer
Spears, Incorporated, 286 Congress Street, Boston, Massachusetts
02210. Contact Mr. Will Spears (617) 338-5350 for additional
information. Collect calls will not be accepted. It is emphasized that
requests for plans and specifications should be directed the A/E firm
listed above to ensure proper handling of requests. Plans and
specifications will be made available for pick up at the A/E's office
and also for delivery at an additional charge. Requests must be in
writing and will be answered on a first-come, first-served basis until
the initial supply is exhausted. For requests made after the initial
supply is exhausted, a non-refundable fee not to exceed the actual cost
of reproduction of the IFB documents (to be determined by the
Contracting Officer,) plus a shipping charge based on each individual
request (if applicable,) will be required in order to obtain the IFB
documents. Pre-Bid Walk-Thru is scheduled for November 21, 1995, at
1:00 p.m. (local) at the Center. This will be the only opportunity to
review the job site prior to submission of bids. Bid-Opening is
scheduled for December 13, 1995, at 2:00 p.m. (local) at the A/E's
office. NOTE: THIS IS A 100% SMALL BUSINESS SET ASIDE ACQUISITION. The
Standard Industrial Classification (SIC) code for this acquisition is
1731. The Small Business Size Standard is $7.0 million.) (300) Loren Data Corp. http://www.ld.com (SYN# 0109 19951031\Z-0002.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|