COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 7,1995 PSA#1468US ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT, Attn: CENAN-EN-MR 26
Federal Plaza, Rm 1843, New York, N.Y. 10278-0900 C -- ARCHITECT-ENGINEER SERVICES FOR UNION BEACH, NEW JERSEY SOL
CBAEPL-5305-0042 POC Willien Cunningham-(212)264-9123. Location: The
borough of Union Beach is located in the northern portion of Monmouth
County, New Jersey, along the coast of Raritan Bay. Scope of Services
Required: Provide professional services in performing feasibility and
design level studies to provide storm damage reduction to Union Beach.
These services will entail performing various engineering services
related to existing beach conditions, design of coastal and costal
inlet improvements, in addition to providing protection from flooding
to interior areas, such as levees, floodwalls, pumping stations,
tide/flap/sluice gates, etc.). This may include aerial
(photogrammetric), cross shore profiles, hudrographic, and/or
topographic surveys; development and servicing of wave gages and other
instrumentation; subsurface investigations and analyses; interior
drainage analyses; coastal processes analyses; and/or storm damage
surveys; residual flooding analysis; foundation analysis; construction
plans and specifications; average annual damages and benefits;
commercial and recreational boating analyses; recreational use survey
analyses; development of coastal and evironmental monitoring programs;
environmental assessments/analyses and cultural resources analyses for
the study location. Techincal Capability Required: Civil engineering,
coastal engineering with experience in coastal processes analyses and
coastal structures (such as bulkheads, jetties, groins and shore
protection) and beach design, structural engineering, flood control,
soils and geophysical engineering, hydraulic engineers, sturctural
engineers, geologist, systems analyst, surveyors, economists
(experienced in performing cost/benefit analyses on civil works
projects, especially storm damage reduction projects), estimating (with
experience on civil works projects, especially storm damage reduction
projects), cost estimating (including ability to produce MCACES Gold
estimates) environmentalists/biologists and cultural resources
specialists/archaeologists. Familiarity with Corps procedures and all
related regulations. Special Qualifications: Subsurface exploration
capabilities (including side scan sonar capabilities, abilit to input
data into the GIS databese, mapping, aerial photography, ability to
obtain borings (land based) and perform a laboratory analysis, ability
to perform and document a remote sensing investigation of an offshore
borrow area), ability to use HECIFH - Hydraulic Engineering Center
Interior Flood Control Package, environmental testing and analysis,
P.E. or P.L.S. certification of supervisor/key personnel, actual
experience in the following: (1) littoral budget, (2) beach, coastal
and coastal inlet structure design, (3) flood control structure design,
(4) interior drainage analysis, (5) beach surveys, (6) storm damage
survey and coastal processes analysis, (7) foundation analysis, (8)
recreational use analysis, (9) hydrographic surveys, (10) mapping, (11)
aerial photography, (12) environmental assessments (13) cultural
resources assessments. Closing Date for Submission of Form 255: 30 days
after CBD advertisiement. Estimated value of contract:
$700,000-$950,000. Evaluation Factors (in Descending Order of
Importance): 1) Professional qualifications necessary for satisfactory
performance of the required services. 2) Specialized experience and
technical competence of the firm in the type of work required. 3)
Capacity of the firm to accomplish the work in the required time
including qualifications of key personnel. 4) Past Esperience, if any,
of the firm with respect to performance on Department of Defense A/E
contracts, in terms of cost control, quality of work, and compliance
with performance scheduled. 5) Location in the general geographic area
of the New York District and knowledge of the locality of the project
site, provided that there are a sufficient number of qualified firms
within the area. 6) The extent or participation of SB, SBD historically
black colleges and universities, and minority institutions is secondary
selection criterion and will be used as a ''tie-breaker'', if
necessary. 7) Volume of work previously awarded to the firm by the
Department of Defense, with the object of effecting an equitable
distribution among qualified A/E firms, including small and
disadvantaged business firms and firms that have not had prior DOD
contracts. This is a secondary selection criterion which will be used
as a ''tie-breaker'' if necessary. Estimated start: 1 February 1996.
Estimated completion: 1 February 1999. Small and disadvantaged firms
are encouraged to participate as prime contractor or as memebers of
joint ventures with other small businesses, and all interested
contractors are reminded that the successful contractor will be
expected to place subcontracts to the maximum practicable extent with
small and disadvantaged firms in accordance with Public Law 95-507. Two
separate contracts would be written against this solicitation. One for
the feasibility study and one for preconstruction engineering and
design. The submittals should be sent in triplicate to Ms. Willien
Cunningham, CENAN-EN-MR, Room 2133, Department of the Army, U.S) Army
Engineer District, New York, Jacob K. Javits Federal Building, New
York, NY 10278-0090. Only those submittals incorporating the 11-92
revisions of the SF 254 and SF255 will be considered. Furthermore,
special attention should be given to the manner in which these forms
are completed. The SF 254 should reflect the overall capacity of the
firm. Whereas, the SF 255 should reflect only the personnel dedicated
tot he specific project referenced in the submittal. These quideline
should be closely followed, since they constitute procedural protocol
in the manner in which the selection process in conducted. Closing date
for this announcement will be 30 days from publication. if this day
falls on a Saturday, Sunday or Holiday, the New closing date will be
the next business day. Firms who have not previously applied for NYD
projects and firms who do not have a current SF 254 on file with NYD
should submit two copies of SF 254 on initial response to our CBD.