Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 9,1995 PSA#1470

DA, Tulsa District, Corps of Engineers, POB 61, Tulsa, OK 74121-0061

C -- USADACS ADMINISTRATION COMPLEX, MCALESTER ARMY AMMUNITION PLANT, MC ALESTER, OKLAHOMA POC Jimmy White, A-E Contracts/Document Section, (918) 669-7043, or Carl Webster, Military Design Section, (918) 669-7161, 1645 S. 101st East Avenue, Tulsa, OK 74128. 17. 1. CONTRACT INFORMATION: A firm fixed-price architect- engineer contract will be negotiated for the concept, preliminary, and final design and construction phase services (optional) for the subject project. All work must be performed by or under the direct supervision of licensed professional engineers and/or architects. The project design will be developed using the metric (SI) system of measurements. This procurement is unrestricted. The anticipated contract award date is Jan 96 and the final completion date is Dec 96. All responders are advised that this requirement may be cancelled or revised at any time during the solicitation, evaluation, selection, negotiation, or final award process based on decisions related to DOD changes in force structure and disposition of US Armed Forces, and are advised that the contract award date(s) and final completion date(s) may vary. If a large business is selected for this contract, and the contract amount exceeds $500,000, it must comply with FAR52.219-9 regarding the requirement for a subcontracting plan on that part of the work it intends to subcontract. For your information, the subcontracting goals for Tulsa District are 65% for small business and 10% for small disadvantaged business. The plan is not required with this submittal. 2. PROJECT INFORMATION: Key elements of this project are: project consists of construction of a) multi-story, brick/veneer 40,000 SQ FT General Purpose Administration Building to accommodate administrative personnel, technical library, TV/Video production studio, photo lab, ADP center, and printing service. b) Open bay metal building 43,200 SQ FT Transportation Test Facility to accommodate Ammunition Peculiar Equipment (APE) prototype development and transportability testing with administrative offices, vibration and noise isolation rooms, and electronics lab. Facility to have rail access, testing track and truck-rail dock. c) Two pre-engineered metal buildings, 20,000 SQ FT, East Warehouse, and 15,000 SQ FT West Warehouse, warehouses to accommodate inert items such as tacical vehicles, APE materials, APE prototypes, inert ammunition containers, and concrete block lockable areas for secure storage. d) Building Information System. Provide supporting facilities including gas, water, sewer, electrical, communications, information systems, fire protection systems, intrusion detection systems, air conditioning, and site work elements, parking, sidewalks, rail, storm drainage systems, security lighting. The estimated construction cost is between $ 10M and $ 20M . 3. SELECTION CRITERIA: See Note 24 for general selection process. The selection criteria in descending order of importance are: a. Specialized experience and technical competence in (1) recent design of similar type military facilities, (2) construction cost estimating and preparation of estimates on IBM Compatible personal computers using Corps of Engineers Computer Aided Cost Estimating System (M-CASES Gold) (software provided), (3) producing CADD drawings in either Intergraph Micro Station, or Micro Station PC Format, (4) producing quality designs, (5) ability to access a Computerized Automatic Review Management System (ARMS) via modem, and (6) construction phase services. b. Past performance on DoD and other contracts with respect to cost control, quality of work, and compliance with delivery schedules. c. Qualified professional personnel with experience in the following disciplines, but not limited to: architect, civil, corrosion control, electrical, environmental, fire protection, mechanical, and structural engineering. Other required team members are landscape architects, specification writers, and estimators. d. Sufficient capacity to submit the Concept Design by April 1996, and complete the design by December 1996. e. Location of the firm in the general geographical area of the project. f. Volume of DoD contract awards in the last 12 months as described in Note 24. 4. SUBMITTAL REQUIREMENTS: See Note 24 for general submittal requirements. Interested firms having the capabilities to perform this work must submit one copy of SF 255 (and a SF 254 for the prime firm and all consultants) to the above address no later than 4:30 p.m. on the 30th day after the date of this announcement. If the 30th day is Saturday, Sunday or Federal Holiday, the deadline is 4:30 p.m. of the next business day. Solicitation packages are not provided. This is not a request for proposal. The SF 255 should specifically addres the requirements of this announcement. Responding firms are requested to clearly identify those tasks to be performed in-house and at what office, and those tasks to be subcontracted and at what office. Responding firms are requested to identify all computer capabilities in Block 10 of the SF 255. Also in Block 10 of the SF 255 describe the firm's design quality control plan, including coordination with subcontractors. Cover letters and extraneous material are not desired and will not be considered. Personal visits to discuss this contract will not be considered. This is not an RFP. (0311)

Loren Data Corp. http://www.ld.com (SYN# 0012 19951108\C-0001.SOL)


C - Architect and Engineering Services - Construction Index Page