|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 22,1995 PSA#1475Commander, Pine Bluff Arsenal, 10-020 Kabrich Circle, Attn: SIOPB- PO,
Pine Bluff, AR 71602-9500 Z -- REPLACEMENT OF DUCKWORK AT THE INCINERATOR COMPLEX SOL
DAAA03-96-R-0008 DUE 120595 POC Pam Burton, Contract Specialist,
501/540-3017. PRESOLICITATION NOTICE: Services for the removal of
existing ductwork and plenum and replacement of said ductwork. The
contractor shall be responsible for the removal and demolition of the
ductwork and shall provide all equipment, materials and labor to
install repalcement ductwork to connect the Car Bottom Furnace (CBF) to
the plenum of the Central Afterburner (CAB). Work shall be accomplished
in accordance with Technical Specifications entitled ''SIOPB-MM-TS,
Replace Ductwork at Incenerator Complex, Carbottom Furnace, Central
Incinerator Complex dated 2 Nov 95. Place of Performance: Pine Bluff
Arsenal, Pine Bluff, AR 71602-9500. The magnitude of said project is
between $250,000 and $500,000. RFP DAAA03-96-R-0008 to issue on or
about 5 Dec 95 with a closing date on or about 11 JAN 96. This
acquisition is being conducted via the Small Business Competitiveness
Demonstration Program. All responsive, responsible offers will be
considered. (0324) Loren Data Corp. http://www.ld.com (SYN# 0196 19951121\Z-0029.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|