|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 27,1995 PSA#1477US Army Corps of Engineers, 26 Federal Plaza New York, NY C -- INDEFINITE DELIVERY CONTRACT FOR MISCELLANEOUS PROJECTS WITHIN
NYD BOUNDRIES BUT PRIMARILY FOR SENECA ARMY DEPOT ACTIVITY AT ROMULUS,
NEW YORK SOL CBAEEN-5283-0040 POC Willien Cunningham-(212)264-9123.
Location: Seneca Army Depot Activity at Romulus, NY. Scope of Work
Required: Preparation of plans, specifications, analysis, reports, cost
estimates, construction services and technical reviews for
miscellaneous projects which include but not limited to renovations of
buildings, offices, HVAC systems, roofing, plumbing, electrical
systems, foundation, structural, utility systems, sidewalk and roadway
work. These projects will be designed in conformance with COE
regulations and DOD design standards. Comprehensive Interior Design
will include the preparation of design documents, cost estimate, and
CID studies. Environmental studies to include permit investigations,
the completion of permit applications and wetlands evaluation. Possible
lead paint, contaminated soil, and asbestos/PCB abatement. Topographic
surveys and subsurface explorations will be conducted in designated
project areas on the base where required. Estimated Construction Cost
Range: For the contract, the cumulative amount of all delivery orders
shall not exceed $750,000 per year. Each delivery order shall not
exceed $150,000. Delivery orders may be issued for one year from the
date of contract award. The contract will include an option for one
additional year under the same terms and conditions as the basic
contract. The Government's obligation to guarantee a minimum amount for
payment is $15,000 for the first year. The minimum amount for the
second year is $7,500. Only one firm will be selected from this
announcement. Estimated construction cost range is not applicable.
Technical capability required but not limited to: Architectural, Civil,
Electrical, Mechanical, Structural, Cost Estimating, Licensed Fire
Protection Engineer, Interior Designer, Surveying, Geotechnical,
Environmental Specialists, and certified industrial hygienist. Firms
not having full in-house capability must demonstrate how they will
manage subcontractors through a management plan. Proposed delivery
orders will be fast tracked requiring the firm to have maximum
capacity. FULL IN HOUSE CAPABILITY IS PREFERRED. Firms must submit in
their submission a plan for management of onsultants, a plan for
successful quality assurance, quality control and how they will
integrate of all design disciplines. Responding firms should indicate
their ability to produce all required work in digitized drawings on
Autocad 13 format, their capability to access an electronic bulletin
board and Automated Review Management System (ARMS) via modem, and the
capability to work with M-CACES (Corps of Engineers Cost Estimating
Software). Specifications are to be submitted in hard copy and on Word
Perfect 6.1 formatted disks. Special qualifications: The selected firm
must have proven capability to produce multiple delivery orders
simultaneously and must be generally within communting distance of the
Romulus, NY area. Previous Army projects design experience is
preferred. Evaluation factors (in descending order of importance): 1)
Professional qualifications necessary for satisfactory performance of
required services; 2) Specialized esperience of the firm in the type of
work required; 3) Capacity of the firm to accomplish the work in the
required time, reflecting qualifications of key personnel; 4) Past
performance if any, on contracts with government agncies and private
industry in terms of cost control, quality of work, and compliance with
performance schedules; 5) Geographic location and knowledge of the
locatlity of the project, provided that application of this criterion
leaves an appopriate number of qualified firms, given the nature and
the size of the project; 6) The estent or participation of small
business, small disadvantage business, historically African-American
colleges and universities, minority institutions is secondary selection
criterion and will be used as a ''tie breaker'', if necessary; and. 7)
The volume of work previously awarded to the firm by the Department of
Defense, with the object of affecting an equitable distribution among
qualified A/E firms, including small and small disadvantaged business
firms, and firms that have not had prior Department of Defense
contracts. Estimated Design Start date: June 1996. Estimated design
Completion date: June 1998. small and disadvantaged firms are
encouraged to participate as prime contractors or as members of joint
ventures with other small businesses, and all interested contractors
are reminded that the successful contractor will be expected to place
subcontractors to the maximum practicable extent with small and
disadvantage firms in accordance with Public Law 95-507. A/E firms
which meet requirements described in this announcement and desiring to
be considered for selection are invited to submit a SF255, A/E and
related services questionnaire for specific porjects to US Army Corps
of Engineers, 26 Federal Plaza NY, NY 10278-0090, ATTN: Ms. W.
Cunningham (Rm 2143). Ms. Cunningham can also be reached at (212)
264-9123. Interested A/E firms having the capabilities to perform this
work must submit their SF255 (and a SF254 for the prime and all
consultants) to the above address no later than the close of business
on the 30th day after the date of this announcement. If the 30th day is
a Saturday, Sunday, or Federal holiday, the deadline is the close of
business of the next business day. Solicitation packages are not
provided for A/E contracts. This is not a request for proposal. Firms
not having a current SF254 already on the file with this office, and
responding to this announcement should submit a copy of the SF254 along
with the SF255. Personal visits for the purpose of discussing the
project are discouraged. Firms will indicate on block 10, page 11 of
their SF255's the total number of Department of Defense A/E Awards
(basics and delivery orders) and the total value of those awards within
the last 12 months prior to the date of this announcement. Firms that
do not comply with this requirement will be considered non-responsive.
Firms should indicate whether their firm is listed in the ACASS System
in Oregon; if yes, plaease indicate your ACASS Number in item 1 of
SF255. If not, submit two (2) copies of SF254 on initial response to
our CBD. (0326) Loren Data Corp. http://www.ld.com (SYN# 0026 19951124\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|