COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 12,1995 PSA#1488USDI, Bureau of Reclamation, Attention: UC-452, 125 South State Street,
Room 6107, Salt Lake City, Utah 84138-1102 Y -- BLOCK 8 PUMPING PLANT B2.1R AND LATERALS B2.1R AND B3.1G,
SCHEDULES 1 AND 2 SOL 1425-6-SI-40-19030 DUE 021395 POC Contact Rick
Kerr, (801) 524-5359, extension 3, Contract Specialist, or Mike C.
Ward, (801) 524-5248, Contracting Officer Price Range $10,000,000 to
$20,000,000. All work to be completed by September 30, 1998. The
principal components of the work to be performed under these
specification include: Earthwork for pipe trenches, pumping plant and
appurtenant structures; Furnishing and laying about 13.5 miles of
8-inch through 48-inch diameter line pipe; Constructing delivery
installations and furnishing and installing steel pipe for delivery
installations; Constructing pumping plant B2.1R, including a
pre-engineered metal building and an elevated steel tank at the pumping
plant site; Furnishing and installing a steel manifold at pumping plant
B2.1R; Furnishing and installing metal piping, supports, and valves;
Furnishing and installing traveling water screen and conveyor;
Furnishing and installing line meters and insertable magnetic
flowmeters; Furnishing and installing the outdoor single-ended primary
and secondary unit substations, the grounding system, the electrical
conduit system, insulated conductors, the 5-kV and 15-kV power cable,
the 5-kV motor control equipment, the motor control center, the
auxiliary control equipment, the plant distribution panelboard and
transformer, the elevated steel tank terminal cabinet, the water level
indicating and control systems, the communications system; and all
associated materials and equipment required to complete the electrical
features at pumping plant B2.1R; Furnishing and installing the pole
mounted distribution transformer and distribution panelboard at the
receiver building for pumping plant B3.1; Furnishing and installing
fiber optic cable at Gallegos Pumping Plant; and finally, Furnishing
and installing the lighting system. Schedule 1 includes Pumping Plant
B2.1R and Lateral B2.1R. Schedule 2 includes Lateral B3.1G, which is
approximately 10.5 miles long. FUNDING WILL NOT BE AVAILABLE FOR
SCHEDULE 2 UNTIL OCTOBER 1, 1996. THE CONTRACTOR SHALL NOT PERFORM ANY
WORK OR ACCRUE ANY COSTS UNDER SCHEDULE 2 UNTIL GIVEN NOTICE TO
PROCEED BY THE CONTRACTING OFFICER. ONLY REQUESTS IN WRIING WILL BE
ACCEPTED FOR SOLICITATIONS. There is a non-refundable charge of $60.00
per set of solicitation documents, payable to: Bureau of Reclamation.
Send check and request to: Bureau of Reclamation, Attention: UC-453,
125 South State Street, Room 6107, Salt Lake City, Utah 84138-1102.
(0342) Loren Data Corp. http://www.ld.com (SYN# 0045 19951211\Y-0001.SOL)