Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 19,1995 PSA#1493

Arnold Engineering Development Center, ATTN: AEDC PKP, 100 Kindel Drive, Suite A332, Arnold AFB, TN 37389-1332

59 -- POWER SUPPLY AND BATTERY SYSTEM SOL F40650-96-Q-0002 DUE 020696 POC Kathy Swanson, Contract Specialist, (615)454-5174, W. Richard Stewart, Contracting Officer. POWER SUPPLY, 10KVA, UNINTERRUPTIBLE POWER SUPPLY (UPS) ON-LINE FERRORESONANT TRANSFORMER BASED UPS SYSTEM TO PROVIDE REGULATED, CLEAN, CONTINUOUS POWER FOR CRITICAL AC LOADS. SYSTEM SHALL INTEGRATE THE BATTERY CHARGER, INVERTER, STATIC SWITCH, AND A MANUAL BYPASS SWITCH IN SINGLE SYSTEM ENCLOSURE. RELIABILITY: GREATER THAN OR EQUAL TO 140,000 HOURS MEAN TIME BETWEEN FAILURE (MTBF); AUDIBLE NOISE: LESS THAN 65DBA(A); ELECTRONICS: MICROPROCESSOR CONTROLLER. SOLID STATE CONTROLS, INC., MODEL SE3010N OR FULLY EQUAL. BATTERY SYSTEM, 60 CELL, FOR 10KVA UPS SYSTEM. MINIMUM 15 MINUTE CAPACITY AT FULL LOAD. BATTERY SYSTEM TO INCLUDE 20 3-CELL BATTERIES AND 1 2-STEP/2-TIER BATTERY RACK COMPLETE WITH ALL INTERCONNECTORS AND HARDWARE. BATTERIES: EXIDE 3CX-5 OR FULLY EQUAL. RACK: EXIDE 1-851481-48 OR FULLY EQUAL. QUANTITY - 2 EACH. DELIVERY TO ARNOLD AFB TN 30 DAYS AFTER CONTRACT AWARD. (0349)

Loren Data Corp. http://www.ld.com (SYN# 0181 19951218\59-0009.SOL)


59 - Electrical and Electronic Equipment Components Index Page