COMMERCE BUSINESS DAILY ISSUE OF JANUARY 24,1996 PSA#1516U.S. Army Engineer District, Honolulu, Corps of Engineers, Room 332C,
Attn: Ms. Sue Kim, Fort Shafter, HI 96858-5440 C -- DESIGN OF PALAU COMPACT ROAD SOL DACW83-96-R-0012 DUE 022396 POC
Mr. Wendell Awada, Technical Manager, (808)438-9011.
Architect-Engineer Services for the Design of Palau Compact Road,
Republic of Palau (ROP). (a) CONTRACT INFORMATION: A-E services,
including the preparation of plans, specifications, design analysis,
and cost estimates, for the solicitation of bids or proposals and
construction phase services for the construction of the Palau Compact
Road. Drawings must be accomplished by computer-aided design. The
design shall be completed in metric units. The A-E shall also be
responsible for obtaining detailed surveys, soil borings, and
geotechnical/pavement design. MULTIPLE SELECTIONS RESULTING IN AWARD OF
SEPARATE CONTRACTS WILL BE MADE FROM THIS ONE ANNOUNCEMENT. Award of
the last contract is estimated not later than one year after the date
of selection approval. Each contract will be for a basic concept
design, with final design as Government Option 1 and Construction Phase
Services as Government Option 2. The estimated design performance
period is 360 calendar days from award of the contract. None of the
projects are yet authorized and funds are not presently available.
Awards will not be made simultaneously. If a large business is selected
for this contract, it must comply with FAR 52.219-9 regarding the
requirement for a subcontracting plan on that part of the work it
intends to subcontract. The subcontracting goals for this contract are
that a minimum of 50% of the contractor's intended subcontract amount
be placed with small business (SB), which includes small disadvantaged
businesses (SDB), and 30% be placed with SDB. The subcontracting plan
is not required with this submittal but the successful large business
firm must submit an acceptable plan before any award can be made. The
selected firm will be required to obtain Defense Base Act insurance
(workman's compensation insurance) for work performed outside the
United States. (b) PROJECT INFORMATION: This project is for the design
to construct a fifty-three (53) mile road system on Babeldoap Island,
ROP. The roadway will be a two-lane paved road with shoulders, related
drainage and bridge structures. The estimated fee for each design
contract is between $1,000,000 and $5,000,000. The estimated total cost
of construction is between $10,000,000 and $25,000,000. A firm fixed
price contract will be negotiated. (c) SELECTION CRITERIA: See Note 24
for general selection process. Selection will be based on the
following criteria in descending order of importance: (1) professional
qualifications of the firm's staff/consultants to be assigned to the
project, (2) specialized experience of the firm in civil and highway
design in accordance with DOD criteria and in CADD design, (3) capacity
of the firm to accomplish work in the required time (ability to meet
schedules, coordinate many various teams of sub-consultants), (4)
geographical knowledge of the locality of the project in terms of
geographic features, construction characteristics, etc., and (5) the
firm's past performance on DOD and private sector contracts (cost
control, quality of work, compliance with schedule) and performance and
experience in construction management (supervision & inspection) for
civil/highway design projects. As secondary selection factors, in
descending order of importance: (1) location of the firm in the general
geographic area of Palau and the Pacific Rim, and (2) extent of
participation of SB, SDB, historically black colleges and universities,
and minority institutions in the proposed contract team, measured as a
percentage of the estimated effort. (d) SUBMISSION REQUIREMENTS: Firms
desiring consideration must submit a Standard Form 255 (Nov. 1992
edition only) no later than 4:00 P.M. Hawaiian Standard Time by the due
date shown above or within thirty (30) calendar days from the CBD
announcement date, whichever is later. Should the due date fall on a
weekend or holiday, the submittal package will be due the first workday
thereafter. A Standard Form 254, if not already on file with the
Pacific Ocean Division, is also required for the prime and any
subconsultants. These documents shall be mailed to the address shown
above. Small and disadvantaged firms are encouraged to participate as
prime contractors or as members of joint ventures with other small
businesses. All interested contractors are reminded that the successful
contractor will be expected to place subcontractors to the maximum
practicable extent with small and disadvantaged firms in accordance
with the provisions of Public Law 95-507. For further information
regarding this proposed acquisition, telephone (808) 438-0021. Request
for Proposal No. DACW83-96-R-0012 shall be utilized to solicit a
proposal from the firm selected. This is not a request for proposal.
See Note 24. (0022) Loren Data Corp. http://www.ld.com (SYN# 0022 19960123\C-0007.SOL)