COMMERCE BUSINESS DAILY ISSUE OF JANUARY 26,1996 PSA#1518National Institutes of Health, Division of Procurement, Acquisition
Branch C, Bldg 13, Rm G-800, 9000 Rockville Pike, Bethesda Md 20892 Z -- TO PROVIDE SERVICES FOR VARIOUS MECHNICAL/ELECTRICAL UTILITY
RELATED TASK ORDERS RELATING TO A LARGE BOILERS & REFRIGERATION. SOL
263-96-P(CD)-0202 POC Milton Timmons, Contracting Officer
(301)402-2163. The National Institutes of Health (NIH) seeks an A/E
contractor (SIC CODE 1872) to provide services for various
mechanical/electrical utility related task orders relating to a large
Boiler and Refrigeration Plant located at the NIH Campus, Bethesda,
Maryland. The A/E shall be responsible for developing designs and
construction documents for mechanical, electrical and structural
systems relating to the Boiler and Refrigeration Plants. The existing
boiler plant has a total capacity of 800,000 lbs/hour steam which
includes four (4) 150,000 lbs/hour boiler, that are over 40 years old,
and one (1) new 200,000 lbs/hour boiler, along with the auxiliary
equipment. The chiller plant consists of two (2) buildings. The chiller
plant has a total capacity of 48,000 tons, which includes six (6) 5000
ton new chillers and six (6) 3000 ton older chillers. Since this is a
new procurement there is not prior procurement history. The initial
task order consists of the preparation of a comprehensive system of
Operation and Maintenance Manuals. The Operation and Maintenance
Manuals shall be a single source reference manual containing complete
information for start-up, operation, maintenance, troubleshooting and
programming both boiler and refrigeration systems. The A/E firm shall
be responsible for field testing the manuals to verify correctness and
usefulness. All work and equipment required for field investigations
and tests shall be provided by the A/E firm. The A/E firm shall prepare
all technical drawings using CADD compatible with the Government CADD
system. All of the above work must be completed within 240 calendar
days after receiving the Notice to Proceed, and without interruption to
normal operation of the existing plants. Eligibility of the A/E firm
for completing work under this contract shall be determined by the
following two (2) factors. The following two factors, 1) past
performance will be given a 50 percent weight and 2) qualification of
key personnel will be given 50 percent weight. In light of this project
summary, interested businesses are invited to submit tailored
capability statements addressing the factors below. Firms responding to
this market survey should keep in mind that only focused and pertinent
information is requested. 1. Past Performance on Similar Projects: The
A/E firm shall demonstrate successful completion of designs and the
writing of O&M manuals for large boiler and refrigeration plants having
heating and cooling application. The projects shall closely match in
size and complexity, with steam capacities equal or greater than
200,000 lbs/hr and chilled water capacities equal or greater than
20,000 tons. The A/E firm shall provide copies of previously completed
O&M manuals for at least two similar projects completed within the
past five (5) years. Copies of O&M manuals should demonstrate
experience and technical knowledge of steam and chilled water
generation systems and associated control technology. The documents
should show that the A/E firm possesses a clear understanding of
standards and procedures for start-up, operating, maintaining, testing,
troubleshooting and preventive maintenance of large plants. The A/E
firm shall provide a list of other designs completed, including
references for the past seven (7) years. References shall include the
name of the installation, with point of contact address and phone
number. 2. Qualifications of Key Personnel: Key personnel, as a
minimum, shall include the following: Project Manager: The Project
Manager must be a registered professional engineer with a Bachelor of
Science degree in mechanical engineering and the experience joined by
being actively engaged in power plant design, operation and
maintenance. Experience must include a thorough knowledge of the
electrical and control technology application for large refrigeration
and boiler plants. This individual must possess a clear understanding
of boiler and refrigeration plant operation and must have experience in
preparing O&M manuals. Mechanical Project Engineer: The Project
Engineer must be an individual with a Bachelor of Science degree in
Mechanical Engineering. This degree may be substituted with ten (10)
years of experience in design, operation, and maintenance of large
boiler and refrigeration plants, or an individual with at least twenty
(20) years of experience operating and maintaining large boiler and
chiller plant operations. Electrical Project Engineer: The Project
Engineer must be an individual with a Bachelor of Science degree in
Electrical Engineering. This degree may be substituted with ten (10)
years of experience in electrical instrumentation and controls relating
to the design, operation, and maintenance of large boiler and
refrigeration plants, or an individual with at least twenty (20) years
of experience in providing instrumentation and control support to the
operation and maintenance of large boiler and chiller plant
operations. Technical Writer: The Technical Writer must have at least
ten (10) years of experience in writing and editing large complex
technical documents to include the development of O&M manuals.
Civil/Structural Project Engineer: The Project Engineer must be a
registered professional engineer with a Bachelor Degree in Civil
Engineering and a minimum of fifteen (15) years of experience in design
and building infrastructure utilities. This individual must have a
thorough knowledge of all building codes and state and local
regulations. (Experience cannot be considered a 100% substitute for
education and professional registration.) The key personnel shall be
those who will have the major project responsibilities. The
availability of these individuals is considered critical to the
accomplishment of the required services. These persons must be
identified by name with specific duties and responsibilities to be
performed. A statement must accompany the resumes of each person
defining the extent of availability and corporate commitment for the
proposed position. Any firm desiring consideration is to submit a
standard for SF 254 (even if currently on file) for the firm and each
consultant and an SF 255, for the team and must be received by 4:00 pm
eastern time within 30 days from the date of this publication. This is
a full and open competition requirement. Women-owned and minority owned
firms are encouraged to participate. This is not an RFP. All 254's &
255's are to be sent to the following: Millton Timmons (Contracting
Officer) 9000 Rockville Pike, Bldg. 13 Rm G-800, Bethesda, MD 20892.
Phone number: (301) 496-8080. (0024) Loren Data Corp. http://www.ld.com (SYN# 0107 19960125\Z-0002.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|