COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1996 PSA#1523US ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT, Attn: CENAN-EN-MR, 26
Federal Plaza, Rm 2143 New York, N.Y. 10278-0900 C -- ARCHITECT-ENGINEER-SERVICES, MAINTENANCE AND REPAIR FOR EXTERIOR
AND INTERIOR SURFACES OF SCOTT BARRACKS (BUILDING 735), U.S. ILITARY
ACADEMY, WEST POINT, NEW YORK SOL CBAEEN-5-337-0021 POC Willien
Cunningham- Procurement Assistant (212)264-9123. Location of work:
Scott Barracks (Building 735) United States Military Academy, West
Point, New York. Scope of services required: The government intends to
award two separate contracts (one for each phase of the work) for the
completion of the services outlined herein. No further announcement
with regards to this project will be made in the future. The services
required are as follows: Phase I.: Develop a final scope of work for
the repair of this historic cadet barracks by conducting field visits
to inspect, investigate, evaluate, and interview various organizations
at USMA to assess the physical condition of the barracks. The final
scope of work must be broken down to reflect the funding categories for
New vs. Maintenace Work items. A preliminry cost estimate must be
developed. Phase II.: Based on the findings in phase I, prepare a
complete design, including plans, specifications, cost estimates,
design analyses and construction services for the FY97 project under
the Operating and Maintenance Army (OMA) program. The project will
entail but not be limited to the complete renovation of the historic
Cadet barracks. The construction work is planned for Sept 97 thru Dec
98. The project will address the following work: Roofing. Masonry work
such as granite stone facade, limestone trim, brickwork, concrete
structures. Exterior doors and windows. Site work such as sidewalks,
pavement, manholes, landscaping. Interior finishes such as flooring,
wall surfaces, ceilings, stairs. Toilet Rooms. Mechanical Systems
including heating, controls systems, fire suppression system, sprinkler
system. Plumbing Systems including main water service line,
distribution piping/vent lines, plumbing. Fire Alarm System. Electrical
Systems including incoming service, distribution panels, lighting
system. Telecommunication System including evaluating public address
system; upgrading telecommunications system including; including
incoming cabling, ductbank system capacity and condition,
telecommunications room, closets, cable tray distribution system,
riser, backboard, termination strips for new voice communications,
category V cabling for telephone and computer tie-in at each cadet desk
location, new coaxial cable for instructional TV and new fiber optic
cable for future telecommunications services at each cadet desk
location. Preparation of documents (plans and narrative including
photographs) for coordination with NYSHPO. The design of this facility
does not require the use of the metric system, we are rehabilitating
an existing structure. Technical capability required: Firms must
demonstrate how they will manage this project to insure quality
control. The prime must identify in the submittal the quantity and
disciplines of personnel in their working office. These specific
disciplines are required: Architects with experience in Historic
Preservation; Civil and Structural Engineering including a roofing
expert; Mechanical and Electrical Engineering including HVAC, plumbing,
utilities, telecommunication (including Fiber Optics), fire
detection/protection systems. A certified asbestos and lead base paint
inspector and experience in testing for PCBs will be required. A Cost
Estimating Specialist is also required. The lead project personnel
must be licensed professional engineers or architects. Special
Qualifications: Previous esperience with maintenance and repair
projects on military installations is preferred. Architectural
expertise with emphasis on maintenance of historical granite/limestone
Gothic style structures will also be of consideration. A/E must have
previous experience with design of projects on an expedited schedule.
The A/E as part of his submittal will include an execution plan which
delineates how the work will be accomlished in the time frame
specified. Submittals should include in section 10 of Sf255 examples of
design work on similar projects that demonstrates the re-use of
construction materials to achieve waste reduction and energy
efficiency. Responding firms should indicate their ability to access an
electronic bulletin board and Automated Review Management System (ARMS)
via a Hayes compatible modem, through an IBM or compatible PC. Past
esperinece with the Corps'M-CACES Gold Cost Estimating program, or the
firm' capability to use these programs are required. In addition firms
should indicate their CADD capapbility and Intergraph Compatibility.
Closing date for submitting SF255: 30 days after advertising date. If
this date falls on a Saturday, Sunday, or Holiday the closing date will
be on the next business day. SF254 should reflect the overall firms
capacity, whereas, SF255 should reflect only the personnel dedicated to
the specific project referenced in the submittal. If subconsultants are
to be utilitized, a SF254 must be submitted for each subconsultant.
These guidelines should be closely followed, since they constitute
procedural protocol in the manner in which the selection process is
conducted. Evaluation factors in descending order of importance: a.
Professional qualifications necessary for satisfactory performance of
required services. b. Specialized experience and technical competence
in the type of work required. c. Capacity to accomplish the work within
the required time. d. Past performance on contracts with government
agencies and private industry in terms of cost control, quality of work
and ocmpliance with performance schedules. e. Location in the general
geographical area of the New York District boundaries and knowledge of
the localities provided that application of this criterion leaves an
appropriate number of qualified firms, given the nature and size of the
project. f. Demonstrated success in prescribing the use of recovered
materials and achieving waste reduction and energy efficiency in
facility design. g. Extent of participation of small busineses, small
disadvantaged businesses, historically black colleges and universities,
and minority institutions in the proposed contract team, measured as a
percentage of the total estimated effort. H. Volume of work previously
awarded to the firm by the Departmant of Defense, with the object of
effecting an equitable distribution among qualified A/E firms,
including small and small disadvantaged business firms and firms that
have not had prior DoD contracts. Start date/Completion: Phase I will
start on or about July 1996 and must be completed by November 1996.
Phase II design will begin on or about January 1997. Design will be on
an expedited schedule and must be completed on or about July 1997 in
order to insure a construction start date of October 1997. Estimated
Construction cost is $1,000,000 to $5,000,000. Small and small
disadvantaged firms are encouraged to participate as prime contractors
or as members of joint ventures with other small businesses. All
interested large firms are reminded that the successful firm will be
expected to place subcontracts to the maximum practicable extent with
small and small disadvantged firms in accordance with Public Law
95-507. If a large business firm is selected, a small business
subcontracting plan will be required prior to award. Firms which have
not previously applied for New York District projects and firms which
do not have a current SF254 on file with the New York District should
submit tow of the SF254 with this initial response to CBD announcement.
Firms using consultants should submit copies of the SF254 for their
consultants. Three (3) copies of the submittal's should be sent to Ms.
Willien Cunningham, CENAM-EN-MR, Room 2133, 26 Federal Plaza, New
York, NY 10278, (212)264-9123. (0031) Loren Data Corp. http://www.ld.com (SYN# 0013 19960201\C-0001.SOL)