COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 21,1996 PSA#1535U.S. Department of Labor, ETA, Division of Acquisition and Assistance,
200 Constitution Avenue, N.W., Room S-4203, Washington, D.C. 20210 Z -- ASBESTOS ABATEMENT AND VENTILATION UPGRADES AT THE GRAFTON JOB
CORPS CENTER, NORTH GRAFTON, MASSACHUSETTS SOL IFB-96-DAA-28-JC DUE
041196 POC David Ragucci, Architect (617) 237-4300; or Kenneth Graves,
Contract Specialist (202) 219-8706. This project consists of the
abatement of friable asbestos pipe insulation and floor tile in the
basement of four buildings and the abandoned steam tunnels connecting
the buildings at the Grafton Job Corps Center located in North Grafton,
Massachusetts. The work will require the construction of permanent
barriers to prevent access to the other tunnels, and the installation
of a tempered make up air unit and associated work in the cement
masonry shop area. The period of performance for construction is 140
calendar days from receipt of notice to proceed through completion of
the project. The estimated cost range of construction is between
$100,000.00 and $250,000.00. Initial Plans and Specifications will be
available on March 12, 1996, only from the Architect/Engineer firm of
MFPA, Incorporated, 192 Worcester Road, Natick, Massachusetts 01760.
Contact Mr. David Ragucci (617) 237-4300 for additional information.
Collect calls will not be accepted. It is emphasized that requests for
plans and specifications should be directed the A/E firm listed above
to ensure proper handling of requests. Plans and specifications will
be made available for pick up at the A/E's office and also for delivery
at an additional charge. Requests must be in writing and will be
answered on a first-come, first-serve basis until the initial supply is
exhausted. For requests made after the initial supply is exhausted, a
non-refundable fee not to exceed the actual cost of reproduction of the
IFB documents (to be determined by the Contracting Officer,) plus a
shipping charge based on each individual request (if applicable,) will
be required in order to obtain the IFB documents. Pre-Bid Walk-Thru is
scheduled for March 26, 1996, at 9:00 a.m. (local) at the Grafton Job
Corps Center. This will be the only opportunity to review the job site
prior to submission of bids. Bid-Opening is scheduled for April 11,
1996, at 1:00 p.m. (local) at the A/E's office. (NOTE: THIS IS A 100%
SMALL BUSINESS SET ASIDE ACQUISITION. The Standard Industrial
Classification (SIC) code for this acquisition is 4953. The Small
Business Size Standard is $6.0 million.) See Numbered Note(s): 1.