COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 26,1996 PSA#1538US Army Engr Dist New Orleans, PO Box 60267, New Orleans La. 70160 C -- PROJECT MONUMENTATION AND RELATED SERVICES WITHIN THE ATCHAFALAYA
BASIN FLOODWAY SOL DACW29-96-R-0014 POC Contract Specialist, Betty
Knight at (504) 862-1099 Contracting Officer, Martha P. Sloan at (504)
862-1161 1. CONTRACT INFORMATION: An approximate 1-year fixed price
contract between $250,000 and $750,000 is scheduled for award on or
about Jun 96. 2. PROJECT INFORMATION: All engineering services,
including furnishing of all personnel, transportation, equipment and
materials are required in connection with surveying and boundary
monumentation on the west side of the Atchafalaya River, in Township 7
South, Range 6 East and Township 7 South, Range 7 East, St. Landry
Parish. Approximately 90 miles of property lines are to be surveyed and
monumented to include, but not limited to corner monuments, witness
posts, signs and blazing. Work shall include the research of public and
Government records to obtain the necessary legal descriptions to
perform boundary surveys. The Contractor shall be required to monument
the boundary line, prepare a boundary monumentation map (including
associated CADD files), and provide all related field survey data. 3.
MINIMUM PRESONNEL AND EQUIPMENT: To be considered for selection a firm
must demonstrate in its SF 255 the availability of at least the
following: two registered land surveyors in the State of LA currently
on the payroll of the prime, three 4-person survey parties, and two
CADD technicians. 4. SELCTION CRITERIA: The selection criteria are
listed below in order of precedence (first by major criterion and then
by each sub-criterion). Criteria 1-7 are primary. Criteria 8-10 are
secondary and will only be used as ''tie-breakers'' among technically
equal firms. (1). Specialized experience (including title research) and
technical competence in the type of work required (to include firm and
key personnel). (2). Capacity to accomplish the work in the required
time. All key personnel and major items of equipment available for
project assignment must be listed along with other pertinent data. (3).
Knowledge of locality of the project. (4). Professional qualifications
necessary for satisfactory performance of required services. (5).
Quality control plan. (6). Past performance on contracts in terms of
cost control, quality of work, and compliance with performance
schedules. (7). Safety plan and performance (manhours lost to accidents
in the last 100,000 manhours of work by firm). (8). Geographic
proximity to Atchafalaya Basin. (9). Extent of participation (measured
as a percentage of total contract) by Small Business, Small
Disadvantaged Business, Historically Black Colleges and Universities,
and Minority Institutions. (10). Volume of DOD contract awards in the
last twelve minths as described in Note 24. 5. SUBMISSION REQUIREMENTS:
See Note 24 for general submission requirements. Firms which meet the
requirements described in this announcment are invited to submit 5
copies of SF 254 and SF 255 (11/92 edition) for the prime and all
subcontractors and consultants not later than 30 days after the date of
this publication. Address the minimum personnel and equipment
requirements and each of the Selection Criteria in Block 10 of the SF
255. For criteria (5) and (7), comprehensive outlines of safety and
quality control plans will be satisfactory. Complete plans will be
required after contract award. Safety performance data (manhours lost)
must be submitted, including data for any subcontractors. If the 30th
day is a Saturday or Sunday, or Federal Holiday, the due date is the
close of business the next business day. For courier deliveries, the
physical address is the U.S. Army Engineer District, New Orleans, Foot
of Prytania Street, New Orleans, LA 70118-1030, Attn: Betty Knight,
CELMN-CT-T. This is not a RFP. Refer to Solicitation No.
DACW29-96-R-0014. (0053) Loren Data Corp. http://www.ld.com (SYN# 0028 19960223\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|