|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 27,1996 PSA#1539VA Medical Center, 801 S. Marion Street, Lake City, FL 32025-5898 Z -- RENOVATE HVAC IN C-11 SOL IFB 594-12-96 DUE 041696 POC Contact
Point, Tami Drake, (904)755-3016x2096, Contracting Officer, Susan
Little, (904)755-3016x2095 Furnish all labor, tools, materials,
equipment and supervision necessary to renovate HVAC in C-11. Work
includes general construction, mechanical and electrical work,
necessary removal of existing construction and certain other items.
Work consists of installing a unitary split heat pump system with duct
work, air distribution and controls, to provide air conditioning for
room C-11 in building 64. Contractor shall install a 10-ton system
consisting of a 10-ton air handling unit matched with two 5-ton heat
pumps to better match system capacity to HVAC load. System shall
include the capability of being connected to the existing Landis & Gyr
Powers Energy Management System. All in strict accordance with plans
and specifications. Cost Range: $25,000 - $100,000. Issue Date:
3/13/96, Pre-Bid Conference: 4/2/96 @9:00AM, Room AB09, Bldg. 64. Bid
Opening: 4/16/96 @ 3:00PM, Room AB09, Bldg. 64. Request for bid package
must be made in writing on or before 4/9/96. This project is subject to
availability of funds. (0054) Loren Data Corp. http://www.ld.com (SYN# 0102 19960226\Z-0013.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|