|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 29,1996 PSA#1541Commander, Pacific Division, Naval Facilities Engineering Command,
Contracts Department, Bldg 258, Pearl Harbor, HI 96860-7300 (Code
0211) C -- ARCHITECT-ENGINEER SERVICES FOR CIVIL/ENVIRONMENTAL PROJECTS,
VARIOUS LOCATIONS, PACNAVFACENGCOM AREAS SOL N62742-96-R-0003 POC
Contact Erik S. Torngren, Contract Specialist, (808) 474-4554 Services
include, but are not limited to design and engineering services for
various civil\environmental projects with associated multi-discipline
architect-engineering support services. The services may include but
are not limited to preparation of technical reports including
conducting engineering investigations and concept studies; project
engineering documentation; preliminary and final design plans and
specifications; construction cost estimates; operations and maintenance
manuals; record drawings; shop drawing reviews; construction
consultation; monitoring of underground storage tank removal; test
holes/testing of soils for contaminants. Projects involve new
construction, site work, landscaping, and repair and maintenance of
water treatment/distribution, drainage and sewage
collection/treatment/disposal systems in various PACNAVFACENGCOM
locations. If asbestos or hazardous materials exist, the
Architect-Engineer (A-E) contractor shall identify them and provide for
their disposal in the required documents in accordance with applicable
rules and regulations pertaining to such hazardous materials. The
selected A-E may be required to participate in a pre-fee meeting within
seven days of notification and provide a fee proposal within ten days
of the meeting. The contract will be of the Indefinite Quantity type
where the work will be required on an ''as-needed'' basis during the
life of the contract providing the Government and contractor agree on
the amount. Each project contract will be a firm fixed price A-E
Contract. The Government will determine the delivery order amounts by
using rates negotiated and negotiate the effort required to perform the
particular project. The contract shall not exceed twelve months or
$1,000,000 total fee, whichever comes first. The Government guarantees
a minimum amount of $50,000. The Government reserves the option to
extend the contract for an additional year. There will be no future
synopsis in the event the options included in the contract are
exercised. Estimated date of contract award is July 1996. Proposals may
be subject to an advisory audit performed by the Defense Contract Audit
Agency. The following selection evaluation criteria, in relative order
of importance, will be used in the evaluation of A-E firms: (1)
Professional qualifications of firm and staff proposed for designing
potable water treatment and distribution systems; wastewater
collection, treatment and disposal systems; site development including
roadways and drainage systems; solid/hazardous waste collection and
disposal systems including subsurface environmental investigations; and
designing in tropical environments similar to Hawaii and Guam. (2)
Specialized recent experience and technical competence of firm or
particular staff members in designing potable water treatment and
distribution systems; wastewater collection, treatment and disposal
systems; site development including roadways and drainage systems;
solid/hazardous waste collection and disposal systems including
subsurface environmental investigations; and designing in tropical
environments similar to Hawaii and Guam. (3) Past performance on
contracts with Government agencies and private industry in terms of
cost control, quality of work, and compliance with performance
schedules. (4) Capacity to accomplish the work in the required time.
(5) Architect-Engineer firm's quality control practices/techniques. (6)
Demonstrated success in prescribing the use of recovered materials and
achieving waste reduction and energy efficiency in facility design.
(7) Location in the general geographical area of the project and
knowledge of the locality of the project; provided, that application of
this criterion leaves an appropriate number of qualified firms, given
the nature and size of the project. (8) The volume of work previously
awarded to the firm by the Department of Defense shall also be
considered, with the object of effecting an equitable distribution of
Department of Defense A-E contracts among qualified A-E firms and firms
that have not had Department of Defense contracts. (9) Use of Small or
Small Disadvantaged or Women-owned Small Business firms shall also be
considered. A Subcontracting Plan will be required from large business
firms with proposed fee of over $500,000.00. This prospective contract
is a potential 100 percent set-aside for small business (SB) concerns.
The small business size standard classification is SIC 8712 ($2.5
million in annual receipts). If adequate interest is not received from
highly qualified SB concerns, this solicitation will automatically be
opened to all firms regardless of size or concern without further
notice. Replies to this notice are, therefore, requested from all
concerns as well as SB concerns. Each firm's past performance and
performance rating(s) will be reviewed during the evaluation process
and can affect the selection outcome. All A-E firms which meet the
requirements described in this announcement are invited to submit
complete, updated Standard Forms 254, Architect Engineer and Related
Services Questionnaire, and 255, Architect-Engineer and Related
Services Questionnaire for Specific Project, to the office shown above.
A-E firms utilized by the prime A-E must also submit completed Standard
Forms 254 and 255. Only one copy of each form is required. IN BLOCK 10
AND AN ADDENDUM THERETO, IF NECESSARY, STATE WHY YOUR FIRM IS
SPECIALLY QUALIFIED BASED ON EACH OF THE ABOVE SELECTION EVALUATION
CRITERIA. FOR SELECTION EVALUATION CRITERION ''(2)'', PROVIDE THE
FOLLOWING INFORMATION FOR ONLY THE STAFF PROPOSED FOR THIS WORK USING
THESE COLUMN HEADINGS: ''NAME'', ''RELATED PROJECTS WORKED ON'',
''YEAR'', ''FIRM'', AND ''TECHNICAL ROLE''. Show the office location
where work will be done and describe the experience and location of
those that will do the work. Firms responding to this announcement
within 30 days from publication date will be considered. Firms must
submit forms to the Contracts Department by 2:00 p.m. HST, on the
closing date. Should the due date fall on a weekend or holiday,
Standard Forms 254 and 255 will be due the first workday thereafter.
This is not a request for a proposal. (0058) Loren Data Corp. http://www.ld.com (SYN# 0022 19960228\C-0008.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|