|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 29,1996 PSA#1541Officer in Charge of Construction, NAVFACENGCOM Contracts, Marianas,
PSC 455, Box 175, FPO AP 96540-2200 C -- INDEFINITE QUANTITY ARCHITECT-ENGINEER SERVICES FOR
MECHANICAL/ELECTRICAL SERVICES, SURVEYS, INVESTIGATIONS, AND STUDIES,
VARIOUS LOCATIONS, GUAM, M.I. SOL N62766-96-R-0003 POC Contact Ms.
Salve M. Sabido, Contract Specialist (671) 333- 2051 This solicitation
will be an indefinite quantity type contract for mechanical and
electrical engineering services for the development and preparation of
plans, specifications, cost estimates, and to conduct special
investigations, studies, analyses, inspections, and preparation of
reports for infrastructure and building projects such as, but not
limited to military family housing facilities, waterfront structures,
medical facilities, airports, airfields, water, sewer and power
systems, mechanical and electrical systems, POL facilities,
recreational facilities, building repair and new construction and other
associated mechanical and electrical works as well as other incidental
work. Post Construction Award Support (PCAS) services are required.
Works are authorized on an ''as required'' basis during the life of the
contract. The total A-E fee for this contract shall not exceed
$500,000.00, and individual fees for any one project shall not exceed
$200,000.00. The contract term shall be for a period of one year, or
until the $500,000.00 limit is reached, whichever occurs first. The
Government has the option to extend the term of the contract in
accordance with the OPTION TO EXTEND THE TERM OF THE A-E CONTRACT
clause. The total contract term, including option, shall not exceed 24
months. The A-E services shall include all field and office work
required to complete the various projects. Field work will include all
required investigations and testing. Office work will include not only
planning documents and preparation of reports, but also meeting with
PWC/OICC personnel and other Government representatives, and oral
presentations and findings and recommendations. Firms responding to
this announcement should indicate their business status in Block 10 of
the SF 255 submission. The following guidelines, in relative order of
importance, will be used in the evaluation of the architect- engineer
firms: (1) Recent specialized experience of the firm and proposed
consultants in the type of work required, especially infrastructure
repair and construction in tropical environment. List projects
successfully designed in the last five years (DO NOT list more than 10
projects). (2) Professional qualifications of the staff (in-house
and/or consultants). Specialized experience and technical competence of
the proposed engineering/technical staff who will perform the work. For
relevant jobs listed in Section 8 of Standard Form 255, A-E firm must
provide the following for each listed job: (a) relevant professional
qualifications of team members, i.e., relevant experience of project
team leader, and similar recent projects completed; (b) performance
rating; and (c) a reference (list of contacts) with telephone number.
(3) Capacity to accomplish the work in the required time. Describe how
work will be accomplished in the required time, including the
composition of the team and availability of staff. (4) Past performance
on contracts with DoD agencies and private industry in terms of cost
control (describe process of cost control in terms of budget control
throughout the design effort as well as bid result, and name of key
person responsible), quality of work, and compliance with performance
schedules. Describe quality control program with demonstrated results
of reducing design errors and/or omissions (provide name of key person
responsible). (5) Location of the firm in the general geographical
area of the project and knowledge of the locality, including
appropriate selection of construction material and methods; provided,
that there is an appropriate number of qualified firms therein for
consideration. (6) Demonstrated success in prescribing the use of
recovered materials and achieving waste reduction and energy efficiency
in facility design. (7) Volume of work previously awarded to the firm
by the Department of Defense during the last 12-month period. Each
firm's past performance and performance rating(s) will be reviewed
during the evaluation process and can affect the selection outcome.
Those firms which meet the requirements described in this announcement
and wish to be considered, must submit one copy each of Standard Form
254 and Standard Form 255 for the firm and Standard Form 254 for each
consultant listed in block 6 of the firms Standard Form 255. IN BLOCK
10 AND AN ADDENDUM THERETO, IF NECESSARY, STATE WHY YOUR FIRM IS
SPECIALLY QUALIFIED BASED ON EACH OF THE ABOVE SELECTION EVALUATION
CRITERIA. FOR SELECTION CRITERIA ''(2)'', PROVIDE THE FOLLOWING
INFORMATION FOR ONLY THE STAFF PROPOSED FOR THIS WORK USING THESE
COLUMN HEADINGS: ''NAME'', ''RELATED PROJECTS WORKED ON'', ''YEAR'',
''FIRM'', AND ''TECHNICAL ROLE''. Show the office location where work
will be done and describe the experience and location of those who will
do the work. Firms responding to this announcement within 30 days from
publication date will be considered. Firms must submit forms to the
Contracts Department by 2:00 p.m., Guam time, on the closing date.
Should the date fall on a weekend or holiday, Standard Forms 254 and
255 will be due the first workday thereafter. Additional information
requested of applying firms: indicate solicitation number in block 2b,
CEC (Contractor Establishment Code) and/or DUNS number (for the
address listed in block 3) and TIN number in block 3. For firms
applying with multiple offices, indicate the office which completed
each of the projects listed in block 8 and list which office is under
contract for any contracts listed in block 9. Firm not providing the
requested information in the format (i.e., listing more than a total of
10 projects in block 8, not providing a brief description of the
quality control plan, not listing which office of multiple office firms
completed projects listed in block 8, etc.) directed by this synopsis
may be negatively evaluated under selection criteria (3). This is not
a request for proposal. (0058) Loren Data Corp. http://www.ld.com (SYN# 0024 19960228\C-0010.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|