|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 29,1996 PSA#1541USDA-Natural Resources Conservation Service, 101 South Main, Temple, TX
76501-7682 Z -- SEDIMENT CONTROL STRUCTURES (SITES 33A-1 AND 33A-2), FORT HOOD
EROSION CONTROL MEASURE, FORT HOOD, TEXAS SOL NRCS-3-TX-96 DUE 041096
POC Contact Point, Contract Section, (817)774-1221 Work under the
project will include the installation of two separate sediment control
structures, Site 33A-1 and Site 33A-2. Work for each site will consist
of constructing an earthfill dam, excavated emergency spillway, and a
corrugated metal pipe (CMP) principal spillway. Major items of work for
the project will include approximately 73,600 CY of of Class C
compacted earthfill; 19,950 CY of unclassified excavation; 124 LF of
24'' I.D. CMP; 13 LF of 42'' I.D. CMP; 136 LF of 48'' I.D. CMP; and 18
LF of 78'' I.D. CMP. Performance period is 131 calendar days.
Estimated price range is between $100,000 and $250,000. Work is located
on Fort Hood Military Reservation (Training Area 33) approximately 4
miles north of Copperas Cove, Coryell County, Texas. Invitations for
Bids will be available, free of charge, on or about March 11, 1996. All
responsible sources may submit a bid which shall be considered by the
agency. (0058) Loren Data Corp. http://www.ld.com (SYN# 0200 19960228\Z-0031.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|