|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 29,1996 PSA#1541USDA-Natural Resources Conservation Service, 101 South Main, Temple, TX
76501-7682 Z -- EROSION CONTROL MEASURES (SITES 33A AND 33B), FORT HOOD EROSION
CONTROL MEASURES, FORT HOOD, TEXAS SOL NRCS-4-TX-96 DUE 041096 POC
Contact Point, Contract Section, (817)774-1221 Work under the project
consists of construction of roadways from existing on-site materials at
the Fort Hood Military Reservation (Training Areas 33A and 33B) located
approximately four miles north of Copperas Cove, Coryell County, Texas.
Items of work include approximately 23,000 LF of roadway; 2,550 LF of
stub diversions; and 110 tons of rock riprap. Performance period is 82
calendar days. Estimated price range is between $25,000 and $100,000.
Invitations for Bids will be available, free of charge, on or about
March 11, 1996. All responsible sources may submit a bid which shall be
considered by the agency. (0058) Loren Data Corp. http://www.ld.com (SYN# 0212 19960228\Z-0043.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|