|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 4,1996 PSA#1543928TH SPTG/LGC, Contracting Division, Bldg 500, Rm 94, O'Hare IAP Air
Reserve Station, IL 60666-5010 H -- JET FUEL TANK AND PIPELINE PRESSURE TESTING DUE 040696. Contact
Paula M. Albert, Contracting Officer 312/825-6082/or Dorothy A. Harris,
Chief, Contracting Division 312/825-6081. Work consists of pressure
testing a JP-8 jet fuel tank and approximately 6,000 feet of piping
both above and below ground at the 928th Air Wing fuel Facility. Total
duration of pressure test will be two (2) hours for each of eight (8)
sections. Test pressure shall be 150% of normal operating pressure.
Work also includes recording of data pertinent to the test, locating
leakage and subsequent repair of leaking areas. This project involves
Confined Space Entry. (058) Loren Data Corp. http://www.ld.com (SYN# 0044 19960301\H-0001.SOL)
H - Quality Control, Testing and Inspection Services Index Page
|
|