|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 6,1996 PSA#1545934 Logistics Group/LGC, Operational Contracting Office, 760 Military
Highway, Minneapolis, MN 55450-2000 Z -- REPLACE BURNERS, HEATING PLANT, BLDG 812 Sol F21611-96-B0001,
contact point: Pat Morris (612) 725-5884, Contracting Officer: Marilyn
Scott. Project QJKL-95-0002 involves the removal of five existing
burners from the boilers in the heating plant and installation of five
new burners capable of burning gas/JP8 fuels, provide new low water
cut-off controls on each burner, reuse the existing automatic boiler
control plane, interface new burners with existing panel for 100%
automatic control, provide the necessary power wiring and control
wiring, remove the existing heating system for Number 5 fuel oil to
include heater, piping and pumps. The SIC Code is 1711. The magnitude
of construction is between $100,000 and $250,000. Project construction
period is 120 calendar days (90 days to order materials and 30 days
for on-site performance). It is anticipated that the solicitation will
be issued o/a 22 March 1996 and opened o/a 22 April 1996. This
acquisition is unrestricted and award will be made pursuant to the
Small Business Competitiveness Demonstration Program. Therefore,
replies to this notice are requested from all interested business
concerns. Telephone requests will not be honored. Interested firms may
request a bid package by submitting a written request to the above
address or a fax request to (612) 725-5379. (061) Loren Data Corp. http://www.ld.com (SYN# 0123 19960305\Z-0032.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|