COMMERCE BUSINESS DAILY ISSUE OF MARCH 20,1996 PSA#1555U.S. Property & Fiscal Office, Camp Lincoln, 1301 N MacArthur Blvd,
Springfield, Illinois 62702-2399 C -- A&E CONTRACT TO DESIGN THE BASE CIVIL ENGINEER FACILITY, BASE
SUPPLY, AND VEHICLE MAINTENANCE FOR RELOCATION OF 126TH AIR REFUELING
WING FROM O'HARE, IL TO SCOTT AIR FORCE BASE, BELLEVILLE, IL Contact
Point, Brian S. Creech, Contract Specialist, (217) 785-3682. The United
States Property and Fiscal Office for Illinois proposes to enter into
a firm fixed price Architect/Engineer contract to provide Type A, B
design and a option for C inspection services for the design of the
facilities listed above for the 126th Air Refueling Wing from Chicago
to Scott Air Force Base. The types of facilities and approximate square
footage of the facilities are as follows: Vehicle Maintenance Complex
14,300 sf; Base Supply Complex 29,000 sf; Base Civil Engineer Facility
25,100 sf. Firms desiring consideration are invited to submit both SF
254 and SF 255 no later than 30 days after publication of this
announcement to USPFO-IL-P&C, ATTN: Brian S. Creech, 1301 N. MacArthur
Blvd., Camp Lincoln, Springfield, Illinois 62702-2399. When submitting
the SF 254 and 255, include the number and dollar value of
Architect/Engineer contracts awarded by DoD agencies during the
previous twelve (12) months. Type A (Investigative Services) -
Accomplish field surveys and investigations which may include soil
investigations, topographic surveys; analysis of existing facilities
and utilities; study of various mechanical, electrical, and structural
systems as a basis for recommended functional and safety designs;
perform environmental assessments as may be required to make proper
site selection and to determine basis of design, and perform other
investigations as necessary to make a complete design. Prepare a
conceptual design submittal, including preliminary site plans, typical
cross sections and narrative description of proposed structural
design, mechanical electrical systems, and economic or other
justification for selected systems. Prepare a cost estimate of the
major elements of the project and confirm if the project can be
accomplished within budget, fact finding investigations, to provide
pertinent design data and information including coordination with users
and reviewing authorities to produce complete designs Type B (Pre-Final
and Final Design) - Prepare detailed Architectural/Engineering design
calculations, site plan, and utility plan, prepare outline
specifications, detailed cost estimate, furnish final design, detailed
working drawings and specifications, final design analysis, final cost
estimates, and obtain any required construction/environmental permits.
Type C (Inspection Services) - Inspection of construction, review of
shop drawings and material submittals and preparation of asbuilt
drawings. Evaluation criteria in descending order of importance are:
(1) Professional Qualifications necessary for satisfactory completion
of required services, to include experienced program manager,
architect, civil engineer, mechanical engineer, electrical engineer,
structural engineer and related support personnel. (2) Specialized
experience and technical competence in the type of work required. (3)
Capacity to accomplish the work in the required time. (4) Past
performance on contracts with government agencies and private industry
in terms of cost control, quality of work, and compliance with
performance schedules. (5) Location in the general geographical area of
Scott Air Force Base and knowledge of the locality of the project. (6)
Volume of work previously awarded to the firm by the Department of
Defense in the past twelve (12) months. The Government's obligation for
award of this contract is contingent upon the availability of
appropriated funds. This procurement is unrestricted. See Note 24.
(075) Loren Data Corp. http://www.ld.com (SYN# 0022 19960319\C-0012.SOL)