|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 22,1996 PSA#1557Sa-Alc/Aircraft Directorate, 375 Airlift Drive-Suite 1, Kelly Afb Texas
78241-6334 J -- MODIFICATTION KITS SOL F41608-96-R-0191 DUE 050896 POC For copy,
Guess, W./laka/210-925-7121, For additional information contact Guess,
W./laka/210-925-7121 This acquisition will consist of fabrication of b1
Group A kits and installation of Group A and B kits on 667 aircraft.
All group B kits and 5 Ea. Group A kits will be government furnished.
(All quantities are estimated). Estimated Schedule is as follows: Base
Year(FY 96): Kit Proof Installation 2ND Year(FY 97) thru (FY 03): 6 -
10 Aircraft per year. Contractor Requirements: 1. Contractor hanger
installation facility must be able to accomodate up to two C-5 aircraft
simultaneously. 2. Runways must be available for moving C-5 aircraft in
and out of the installation facility. 3. Installation support
facilities must be available to perform sheet metal, fiberglass and C-5
aircraft ground handling tasks. Fax number (21)9225-8812 The
approximate issue/response date will be 08 Apr 96. To: Lockheed
Corporation, Marietta Ga 30063-0000. To: Chrysler Technologies Airborne
Sys, Waco Tx 76715-4580. No telephone requests. Only written or faxed
requests received directly from the requestor are acceptable. All
responsible sources solicited may submit a bid, proposal, or quotation
which shall be considered. (0080) Loren Data Corp. http://www.ld.com (SYN# 0043 19960321\J-0007.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|