|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 28,1996 PSA#1561U.S. Army Engineer District, Savannah, P.O. Box 889, Savannah, GA,
31402-0889 C -- DESIGN RESCUE SQUADRON BEDDOWN FACILITIES, MOODY AFB, GA POC Mr.
Robert A. Smith at 912/652-5706. 1. CONTRACT INFORMATION: A-E services
are required for site investigation, planning engineering studies and
preparation of Customer Concept Design(CCD's) which are approximately
15% concept designs, final design(option) and construction related
services. This will be a firm fixed price contract. The contract is
anticipated to be awarded in May 1996 with CCD's to be completed by
August 1996. The Final(option) will be approximately 180 calendar days
in length. The estimated construction cost range is $10,000,000 to
$20,000,000. This announcement is open to all firms regardless of size.
2. PROJECT INFORMATION: A-E services are required to prepare CCD's for
five Rescue Squadron Facilities at Moody AFB, Ga. The bldgs are two(2)
Squadron Operations Facilities, a C-130 Maintenance Hangar and two(2)
Storage Igloos. The estimates for this project shall be prepared using
the latest version of MCACES Gold Software. The software and User's
Manual will be provided by the Savannah District free of charge to the
successful A-E. The drawings will be prepared using graphics created
via Microstation 32 or Micro/Station PC (4.0) and or Auto CADD version
11. All drawing files delivered to the District that have been created
using AutoCADD Version 11 must be translated to .dgn files. The
Contractor shall possess the software to enable the full translation of
drawing files from .dwg to .dgn and vice versa. Before final selection
the preselected A-E's may be required to demonstrated the above
compatibility by reproducing a Government Supplied standard drawing and
translating it to the Intergraph format stated above. The method of
translation must be thoroughly described and documented in Block 10 of
the SF 255 if the A-E does not have an Intergraph CADD System. The A-E
firm will be required to submit a Design Quality Assurance Plan
concurrently with their fee proposal. Information on what is to be
contained in this plan will be furnished upon notification of
selection. Firms responding to this announcement are requested not to
transmit this plan with their SF 255. The specifications will be
produced in SPECINTACT using Corps of Engineers Military Construction
Guide Specification. The responses to design review comments will be
provided on Corps of Engineers Automated Review Management Systems
(ARMS) (software provided). SELECTION CRITERIA: See Note 24 for general
selection process. The selection criteria are listed below in
descending order of importance. Criteria a-e are primary. Criteria f-g
are secondary and will be only used as ''tie-breakers'' among
technically equal firms. PRIMARY CRITERIA - a. Specialized experience
and technical competence/knowledge of: (1) recent experience with major
Air Force beddown projects, (2) design of AirForce squadron operations
facilities, (3) design of AirForce maintenance hangar facilities, (4)
design of AirForce storage igloos, (5) designs involving the Charette
process, (6) Cost Engineering using MCACES Gold Software, (7) Use of
CADD and translation into Intergraph format, (8) Design in metric
dimensioning. b. Past performance on DoD and other contracts with
respect to cost control, quality of work, and compliance with
performance schedules. c. Capacity to accomplish the work in the stated
contract period and to dedicate at least 3 mechanical engineers, 2
architects, 2 electrical engineers, 2 civil engineers, 2 structural
engineers and 1 topographic survey crew. The design team must include
a Registered Engineer or Registered Architect who is a full ''member''
in good standing of the Society of Fire Protection Engineers (SFPE) or
an individual who is a registered Fire Protection Engineer and whose
principle duties are Fire Protection Engineering. d. Professional
qualifications of key management and professional staff members. e.
Knowledge of the locality as it pertains to design and construction
methods of major site development projects in the geographic area of
this project. SECONDARY CRITERIA - f. Extent of participation of SB,
SDB, WO, historically black colleges and university and minority
institutions in the proposal contract team, measured by percentage of
the estimated effort. g. Location of the firm in the general geographic
area of the project. h. Volume of DoD contract awards in the last 12
months as described n Note 24. 4. SUBMITTAL REQUIREMENTS: See Note 24
for general submission requirements. Interested firms having the
capabilities to perform this work must submit ONE (1) copy of SF 255
(11/92 edition) for PRIME and ONE (1) copy of SF 254 (11/92 edition) of
prime firm and all consultants, to the attention of U.S. Army Engineer
District, Savannah, ATTN: CESAS-EN-EA, 100 W. Oglethorpe, Savannah, GA
31401-3640 by 01 May 1996 to be considered for selection. Include the
firm's ACASS number on the SF 255, block 3b. For ACASS information,
call 503/326-3459. DEPTH of PRIME and SUBCONTRACTOR personnel in EACH
discipline must be SHOWN in Block 4 of SF 255 and SF 254 to CLEARLY
identify the NUMBER OF PERSONNEL in each firm and DISCIPLINE. COVER
letters and EXTRANEOUS materials ARE NOT DESIRED and WILL NOT be
CONSIDERED. PHONE calls are DISCOURAGED unless ABSOLUTELY NECESSARY.
PERSONAL visits for the PURPOSE of DISCUSSING this announcement WILL
NOT BE SCHEDULED. This is NOT A REQUEST FOR A PROPOSAL. (0086) Loren Data Corp. http://www.ld.com (SYN# 0016 19960327\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|