COMMERCE BUSINESS DAILY ISSUE OF APRIL 8,1996 PSA#1568U. S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT, 215 NORTH 17th STREET
OMAHA, NE 68102-4978 C -- ADD/ALTER DORM-PHASE V, PETERSON AFB, COLORADO SOL
DACA45-96-R-0035 POC For further information, Contact Brian Nohr at:
(402) 221-4738. CONTRACT INFORMATION: Types of services required will
include site investigations, concept design, final design (option),
construction phase services (option). A Firm Fixed Price Contract will
be negotiated for these services. Estimated completion date is August,
1997 with anticipated start date of August 1996. The Omaha District
will establish a design partnership for this project. Prior to
negotiation, the A-E will attend a one-day partnering meeting at the
Omaha District offices to define Omaha District expectations of the
A-E, create a positive working atmosphere, encourage open communication
and identify common goals. Greater emphasis will also be placed on the
A-E's quality control procedures for this project. The Districts
review of the project will not be intended to replace the A-E's quality
review. The A-E selected for this project must submit for approval a
project-specific design quality control plan as a condition of contract
award. This plan is not required with this submittal. If a large
business is selected for this project, it must comply with FAR 52.219-9
regarding the requirement for a subcontracting plan on that part of the
work it intends to contract. This plan is not required with this
submittal. The subcontracting goals for this contract are that a
minimum of 53% of the contractor's intended subcontract amount be
placed with small businesses (SB), including small disadvantaged
businesses (SDB) and Women Owned Businesses (WOB), 9% be placed with
SDB, and 3% be placed with WOB. The on-site data gathering and
charrette process will be used on this project. PROJECT INFORMATION:
Project consists of alterations to a 2,450 SM existing structure and
addition of 300 SM new structure to provide dormitory space for 68
enlisted persons. Design includes dormitory rooms configured as room-
bath/kitchen-room module, exterior entrances and balconies, shared
service areas and upgrade of electrical and HVAC systems. Design will
also include laundry rooms, day rooms and storage areas. Asbestos and
lead paint removal is anticipated. Site work will include demolition,
utilities, parking and landscaping. The design will require in site
adaptation of the construction documents for Phase III & IV and will
include lessons learned from those projects. Firms shall be familiar
with applicable EPA, OSHA, and State of Colorado regulations relating
to asbestos sampling and testing and design of asbestos and lead paint
removal. Use of the metric system of measurement may be required for
some deliverables under the proposed contract, however, metric system
experience is not a selection criterion and is not required for
selection. The estimated construction cost is between $1,000,000 and
$5,000,000. SELECTION CRITERIA: See Note 24 for general selection
process. Criteria for selection, in order of importance, are: (a)
Recent specialized experience and technical competence of the firm
(including consultants) in: (1) Performing services on facilities
similar to those described above. (2) Producing quality designs as
evidenced by the firm's quality control procedures. The A-E must be
able to provide designs that meet guidance and criteria and quality
standards without detailed review by the District. (3) Effective
coordination and management of the project team, including
consultants.(4) Construction cost estimating and preparation of
estimates on IBM compatible personal computers using Corps of Engineers
Micro-Computer Aided Cost Estimating System (M-CACES) GOLD version or
similar system (M-CACES software will be provided). (5) Producing
Computer Aided Drafting and Design (CADD) drawings fully compatible
with one of the following: Intergraph Unix System 5 Microstation 32
(version 5.0 or later, Intergraph MS-DOS Microstation PC (version 5.0
or later). (d) Professional qualifications and specialized experience
in providing services similar to those listed above of the proposed
team members (including consultants)in performing the types of services
anticipated under this contract as outlined above. Disciplines required
are as follows: architecture, structural, electrical, mechanical,
civil, landscape architecture, and environmental (asbestos and lead
paint). (e) Capacity to perform the work in the required time. (f) Past
performance as described in Note 24. (g) Location in the general
geographic area of the project and knowledge of the locality of the
project. (h) Extent of participation of SB, SDB, historically black
colleges and universities, and minority institutions in the proposed
contract team, measured as a percentage of the estimated effort. (i)
Volume of DOD contract awards in the last 12 months as described in
Note 24. SUBMITTAL REQUIREMENTS: Solicitation packages are not provided
for A-E contracts. This is not a request for proposal. Firms desiring
consideration shall submit two copies of a combined SF 255 and separate
SFs 254 for prime and each consultant. To be considered, submittals
must be addressed as follows: U.S. Army Corps of Engineers, Omaha
District, CEMRO-ED-C, ATTN: John M. Miller, 215 N. 17th Street, Omaha,
NE 68102-4978. Submittals must be received no later than close of
business on the 30th day after the date of publication of this
announcement. If the 30th day is a Saturday or Sunday or a federal
holiday, the deadline will be the close of business on the next
business day. In block 10 of the SF 255, provide the following: (a)
Design Management Plan (DMP). The DMP should be brief and include an
explanation of the firm's management approach, management of
subcontractors (if applicable), specific quality control procedures
used and an organizational chart showing the inter-relationship of
management and various team components (including subcontractors). (b)
The firm's present workload and the availability of the project team
(including consultants) for the specified contract performance period.
(c ) The firm's past performance and familiarity with the charrette
process through use of in-house staff or consultant. In block 7 of SF
255 include team member's experience in participating on interactive
conceptual design teams (charrettes). In block 3 of SF 255 provide the
submitting firm's number (six or seven digits) assigned by the North
Pacific Division, U.S. Army Corps of Engineers, for the
Architect-Engineer Contract Administration Support System (ACASS) and
the firm number for any consultants in block 6 of the SF 255. If
unknown, so state. To receive information to obtain an ACASS number,
call (503) 326-3459. Personal visits for this solicitation to the Omaha
District offices or the project site will not be scheduled.
Administrative and procedural questions shall be directed to John M.
Miller at (402) 221-4176. See Numbered Note(s): 24. (0095) Loren Data Corp. http://www.ld.com (SYN# 0014 19960405\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|