|
|
|
Z - Maintenance, Repair or Alteration of Real Property
AWARDS
- INDEFINITE QUANTITY CONSTRUCTION CONTRACT FOR ROUTINE
- AUXILIARY SALT WATER AND DRAINAGE SYSTEM REPAIRS, AT
- PART A: MCON PROJECT P-549, DREDGING ALONG QUAYWALL &
- INSTALL SPRINKLER SYSTEM, BLDG. RR-4, PHASE I, MCB,
- ST PAUL, MINNESOTA, PROCESSING AND DISTRIBUTION CENTER
- REPAIR STORM DRAIN, BASEWIDE
- SIMPLIFIED ACQUISITION OF BASE ENGINEERING
- MODIFICATIONS TO ELECTRICAL POWER SYSTEM, BUILDING
- SOUTH FLORIDA AREA - INDEFINITE QUANTITY CONSTRUCTION
- ELECTRICAL REHABILITATION AT U.S. COAST GUARD
- REPLACE ELECTRICAL/REPAIR INTERIOR FINISHES OLD
- ROOF REPLACEMENT
- PAINTING & REPAIR OF BLDGS AND STRUCTURES
- REPAIR SEWER LINE, SIERRA ARMY DEPOT, CALIFORNIA
- REPLACE PIPING INSULATION, USCG AIR STATION BROOKLYN,
- INSTALL CE LAN INFRASTRUCTURE
- REPAIR/REPLACE ROOFS
- MAINTENANCE DREDGING CHINCOTEAGUE INLET, ACCOMACK
- CONSTRUCTION OF BANK STABILIZATION MEASURES ON 3 SITES
- CONSTRUCTION OF BANK STABILIZATION MEASURES ON 3
- REPAIR VSTOL TRAINING FACILITY AT THE MARINE CORPS
- CONSTRUCTION OF BANK STABILIZATION ON TALLAHATCHIE
- REPLACE CHILLERS, MULTIPLE BUILDINGS, EGLIN AFB FL
- VARIOUS LOCATIONS IN OHIO, INDEFINITE QUANTITY
- PAINT INTERIOR OF BUILDING 241
- RENOVATION, US POST OFFICE, MAIDEN, NC 28650-9998
- PEACEKEEPER
- UPGRADE OF FIRE SPRINKLER SYSTEM
- WATERPROOF PARKING LOT/DENNIS CHAVEZ FB/
Today's CBD Index Page
Created on September 22, 1996 by Loren Data Corp. --
info@ld.com
|
|
|