COMMERCE BUSINESS DAILY ISSUE OF APRIL 15,1996 PSA#1573Department of the Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- RECONSTRUCTION OF QUINCY RESERVOIR DAM, BRAINTREE, MASSACHUSETTS
SOL DACW33-96-B-0026 DUE 053096 POC Jerry Nunziato, 617-647-8424
Correction: The work consists of removing existing dam's earthen
embankment, portions of the dam's concrete rubble core wall, and the
existing concrete outlet works, comprising about 100,000 CY of
excavation work. Prior to removal of the existing dam, the work
includes draining the reservoir, preparation of the reservoir area for
the stockpiling of materials, diversion of water, and construction of
haul routes. The new work consists of reconstructing the earthen dam
embankment, a dike, and constructing a new concrete outlet works and
spillway structure. The new concrete structure consists of about 2,300
CY reinforced concrete materials. The earthen dam reconstruction
consists of about 110,000 CY of fill material. A significant portion of
the fill material is from reuse of material from the existing dam.
Other work includes installing rock anchors, rock excavation, pressure
grouting of grout curtains in fractured rock, and hand preparation of
foundation bedrock surfaces. Related work includes erosion control, a
precast concrete bridge over the spillway and restoration of areas
disturbed during construction. The work will be phased construction
with critical schedule milestones. Estimated cost of the work is
between $5,000,000.00 and $10,000,000.00. Work shall be completed
within 720 calendar days. Plans and specifications available on or
about 042596 at a cost of $30.00 per set. All responsible sources may
submit a bid which will be considered by the New England Division.
(0102) Loren Data Corp. http://www.ld.com (SYN# 0116 19960412\Z-0010.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|