Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 14,1996 PSA#1594

31st Contracting Squadron/LGCC, Unit 6102 Box 140, APO AE 09601-2140

C -- ENVIRONMENTAL POLLUTION PHENOMENON INVESTIGATION AND RISK ASSESSMENT SOL F61211-96-RA049 DUE 960531. Contact Mr. Luciano Netto, 011-39/434-667176. Assessment of possible hydrocarbon pollution phenomenon at the power production facility, bldg. 416, S. Vito dei Normanni A.S., Brindisi, Italy. The supposed origin of the pollution can be considered migrating hydrocarbons from adjacent areas and possible hazardous waste spills. The Architect-Engineer firm shall perform required study in three phases. Phase I: preliminary site survey, review of previous remedial investigation and other pertinent data and the presentation of a comprehensive work plan. Phase II. execution of site exploration, testing, sampling and analysis. Phase III: preparation and presentation of a report containing pollution assessment, human and environmental risk assessment and remedial actions study. Work includes interface/coordination with Italian regulatory authorities and translation of work products into the Italian language. Pre selection and selection boards will consider submitted Standard Forms (SFs) 254 and 255 and select most qualified firm based on highest points scored. Evaluation criteria and maximum available points are: Specialized experience - 25 points, Past performance - 22 points. Volume of work - 2 points. SFs and 254 and 255 may also be faxed to the following number: country code 39 number 434-668758 or 667979. (129)

Loren Data Corp. http://www.ld.com (SYN# 0026 19960513\C-0006.SOL)


C - Architect and Engineering Services - Construction Index Page