|
COMMERCE BUSINESS DAILY ISSUE OF MAY 14,1996 PSA#159431st Contracting Squadron/LGCC, Unit 6102 Box 140, APO AE 09601-2140 C -- ENVIRONMENTAL POLLUTION PHENOMENON INVESTIGATION AND RISK
ASSESSMENT SOL F61211-96-RA049 DUE 960531. Contact Mr. Luciano Netto,
011-39/434-667176. Assessment of possible hydrocarbon pollution
phenomenon at the power production facility, bldg. 416, S. Vito dei
Normanni A.S., Brindisi, Italy. The supposed origin of the pollution
can be considered migrating hydrocarbons from adjacent areas and
possible hazardous waste spills. The Architect-Engineer firm shall
perform required study in three phases. Phase I: preliminary site
survey, review of previous remedial investigation and other pertinent
data and the presentation of a comprehensive work plan. Phase II.
execution of site exploration, testing, sampling and analysis. Phase
III: preparation and presentation of a report containing pollution
assessment, human and environmental risk assessment and remedial
actions study. Work includes interface/coordination with Italian
regulatory authorities and translation of work products into the
Italian language. Pre selection and selection boards will consider
submitted Standard Forms (SFs) 254 and 255 and select most qualified
firm based on highest points scored. Evaluation criteria and maximum
available points are: Specialized experience - 25 points, Past
performance - 22 points. Volume of work - 2 points. SFs and 254 and 255
may also be faxed to the following number: country code 39 number
434-668758 or 667979. (129) Loren Data Corp. http://www.ld.com (SYN# 0026 19960513\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|